My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/26/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 03/26/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:06:02 AM
Creation date
9/3/2003 2:58:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/26/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br />Mayor Gamec stated that there are problems with heating and cooling for the area because of the <br />high ceiling, the stairway is another issue. At this time they are looking for a temporary fast fix <br />to the problem. <br /> <br />Councilmember Hendriksen replied that ceiling height and.length of time weren't compelling <br />arguments. <br /> <br />Mr. Baxley noted that the other issues would be security and the overall cost of the completing <br />the project. What has been proposed, for a relatively small cost, has provided adequate space and <br />updates the area. <br /> <br />Councilmember Hendriksen replied that the option presented does not add any additional square <br />footage. In his scenario they would be adding a lot of additional square footage, for office space: <br />He stated that he did not und:~3~i~d the reluctance especially when they are spending $8,000 to <br />reconstruct the counter sphd~, whi~:,'he thought was the main objectior~. <br /> <br />Councilmember Kurak stated that'the>: are not adding square footage, but they are getting <br />additional ofnce space 1~3 bettdit'di~ilizj21g'~me of the space. ' <br /> <br />Councilmember Zimmerman' :~4bsti:Ghed t~a estimated cost to complete the project as <br />recommended by Councilmember <br /> <br />Mayor Gamec noted that at the last wiark sessJ:oa:i~':~i:'stated that it would cost at least $82,000. <br /> <br />Ms. Boddinger noted that the big unknown at t~b: ~"evious .~rk session pertaining to that option <br />was the cost of the electrical and ventilation. <br /> <br />Councilmember Hendriksen stated that they "~e~' tall4hg abdb.ti,i?doing one solution in an <br />extravagant way and then doing a minor band-aid and not ~13dressi~all the issues. He felt that <br />they could do what he suggested for the same amount of moneg ~i:i:th~, project presented and <br />create additional space. There would not be additional employ~'~6' the"~ount of electrical use <br />would not increase. He did not think that they should sg~;a s~gmficant amount of money <br />without adding workspace. <br /> <br />Councilmember Kurak felt that what was presented by the consultant was a good idea and <br />needed to be done as soon as possible for the employees. She did not feel that turning the main <br />entrance area into office space was reasonable because it does not have good ventilation or <br />heating. <br /> <br />Councilmember Anderson inquired if the consultant's direction was to come up with a specific <br />plan or was it open-ended. <br /> <br />Mr. Baxley replied that they were directed to develop a short-term solution to eliminate some <br />inefficiencies that currently existed with cost being a large factor. He explained that if they were <br /> <br />City Council/January 15, 2002 <br /> Page 3 of 8 <br /> <br />-25- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.