My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 08/12/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:52:30 PM
Creation date
9/5/2003 12:48:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br />! <br /> <br />With the un-paved gravel rural ditch section option, the City pays none of the <br />street cost. The gravel optiqn would consist of constructing the streets to rural <br />sections with a 4 inch gravel surface. In addition, residents will be responsible <br />for the ongoing maintenance of gravel streets, which includes, replacement of <br />gravel as stated in the discussion of the dirt street and maintenance program. <br />Residents will also be responsible for dust control and grading as part of the <br />scheduled maintenance. The annual cost of the scheduled maintenance is <br />estimated to be approximately $70 per 100 foot lot per year <br /> <br />STORM DRAINAGE <br /> <br />Since this project is within an existing subdivision with existing streets, the cost of <br />the storm drainage will be paid from the City's Storm Water Utility Fund. <br /> <br />WATER & SEWER <br /> <br />The cost of the water and sanitary sewer will be paid with hookup fees at the time <br />of hookup. The City's current schedule of these hookup fees per hookup are: <br /> <br />Water: $1,285 <br /> $ 7,122 <br /> <br />$ 8,407 <br /> <br />TrUnk Connection Charge <br />Lateral Benefit Charge <br />Total <br /> <br />Sewer: $ 577 <br /> $ 3,2OO <br /> <br />$ 3,777 <br /> <br />Trunk Connection Charge <br />Lateral Benefit Charge <br />Total <br /> <br />Total Water & Sewer Hobkup Charges: $ 12,184' <br /> <br />*Residence will be subject to SAC ($1,465) and WAC ($1,350) charges at time of <br />hookup. <br /> <br />SHARED BENEFITS <br /> <br />This report will also discuss the shared benefit or relationship of these <br />improvements with two adjacent project areas, which are the subject of separate <br />feasibility reports. The commonality of the proposed improvements in all three <br />project areas create the desire to schedule all three projects for construction, at <br />the same time period, possibly resulting in reduced construction cost. <br /> <br />One'of the projects is the currently undeveloped area west of this subdivision <br />referred to as" South of City Hall Campus" in previous staff reports and as <br />"Helium Street Extension-C.O.R. Project No. 02-20" in a separate feasibility <br />report. <br /> <br />The other project is the residential subdivision southwest of this subdivision <br />referred to as "Pondvale Estates- C.O.R. Project No. 02-22" in its separate <br />feasibility report. <br /> <br />Page 2 <br />G:\MunicipaltARAM SEY\633\RA633FSR2.doc <br /> <br />-203- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.