Laserfiche WebLink
I <br />I <br />I <br /> <br />(d) Storm Water Maintenance through 90% buildout <br /> <br />(e) Lateral Sanitary Sewer (Urban) <br /> <br />(f) Lateral Watermain (Urban) <br /> <br />I <br />I <br /> <br />(g) Streets <br /> <br />(h) Concrete Curb and Gutter (Urban) <br /> <br />(i) Street Traffic Control Signals <br /> <br />I <br />I <br /> <br />0) Easement Acquisition <br /> <br />(k) Lot Grading <br /> <br />(1) Trail Development <br /> <br />9.50.50 <br /> <br />I <br />I <br /> <br />(m) Sidewalks <br /> <br />(n) Electricity (within ¼ mile) <br /> <br />(o) Phone (within ¼ mile) <br /> <br />I <br />I <br /> <br />(p) Natural gas within lA mile) <br /> <br />(q) Boulevard Sodding <br /> <br />(r) As-Built Plans <br /> <br />Stage II Improvements. Minor and miscellaneous items required <br />prior to acceptance by the City <br /> <br />I <br />I <br /> <br />(a) Inspection <br /> <br />(b) Street Striping and Signing <br /> <br />(c) Seal Coating (or escrow for) <br /> <br />I <br />I <br />I <br /> <br />(d) Street Traffic Control Signs <br /> <br />(e) Street Lights <br /> <br />In addition to the above Stage I and Stage II improvements, additional <br />improvements may be required in the Specificdevelopment agreement. <br /> <br />9.50 Subdivision Regulations <br /> <br />9-37 March 2003 Draft <br /> <br /> <br />