Laserfiche WebLink
I <br /> Proposal To Pave Jackel St NW With A Minimum Of 3' Of Bituminous Material I <br />Jackel street NW is scheduled to be paved in July, as per the signed petition on <br /> 1 <br />record at Ramsey City Hall. The sched .uled depth of the Bitiminous topping is now · <br />2". In the past, the roads paved with this thic .kness in our area, have began to <br />deterioate at a rapid pace. The undersigned w~sh to pay the added cost to increase <br />the thickness of the topping to 3", which will prolong the life of our street. <br /> <br />I <br /> <br />I <br />1 <br /> <br />178 <br /> <br />I <br /> <br /> <br />