Laserfiche WebLink
I <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> CASE #: <br />AWARD CONTRACT FOR CONSTRUCTION OF WATER TOWER NO. 2 <br /> By: Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />On June 20, 2000 bid proposals were received from four proposers for their different style of <br />elevated 1.5 million gallon water towers. You will recall that these styles included for bidding <br />included: (a) a fluted steel column (similar to the City of Champlin), (b) a spheroid (like the <br />City's existing 0.5 million gallon tank), and (c) the composite (similar to the fluted steel tower, <br />but with a masonry column). You will also recall the City was interested in obtaining an <br />alternate bid for an early completed date for the tower so that it could be in use to meet the peak <br />demand period of the summer of 2001. Below are the results of the bidding: <br /> <br />Bidder <br /> <br />Fluted Column <br /> <br />Tank Style <br /> <br /> Spheroid <br /> <br />Composite <br /> <br />PDM <br /> <br /> $1,443,000 <br />($1,445,000) <br /> <br /> $1,595,000 <br />($1,607,000) <br /> <br /> $1,408,000 <br />($1,408,000) <br /> <br />CBI NO BID $2,056,500 $1,984,500 <br /> (NO BID) (NO BID) (NO BID) <br /> <br />Landmark NO BID NO BID $1,394,000 <br /> (NO BID) (NO BID) ($1,459,000) <br /> <br />Caldwell $1,568,100 NO BID NO BID <br /> ($1,758,000) (NO BID) (NO BID) <br /> <br />Note: ( $ ) alternate bid for early completion - June 18, 2001 <br /> <br />The base bid shown is for a completion date of October 15, 2001. The bid for the early <br />completion date is shown in parenthesis. Attached is a CIP sheet showing the overall budget for <br />this project estimated at $1,870,000. The design and construction services from AEC <br />Engineering for the tank are $1~2,800,000 leaving a remaining budget $1,767,200 for <br />construction. <br /> <br />Recommendation: <br /> <br />It is staff's recommendation that the early construction date be elected for the fluted column steel <br />tank, and awarded to PDM in the amount of $1,445,000. This award amount is $327,200 below <br />the CIP budget for this project. The early completion date is $2,000 additional cost for this <br /> <br />181 <br /> <br /> <br />