My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/07/2011
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2011
>
Agenda - Planning Commission - 04/07/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:06:52 AM
Creation date
4/1/2011 2:22:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
04/07/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t Metropolitan Council Local Planning Handbook 1 Section 5 Water Resources Management <br />Community Municipalities that include a public or private treatment system must <br />treatment systems include the following: <br />plans <br />Local wastewater <br />treatment plants <br />plans <br />• A map showing the location of existing public and <br />private treatment systems that serve more than one home <br />or business. These may include such systems as package <br />treatment plants and group on -site systems. <br />• A description of conditions under which the <br />municipalities allow community treatment systems such <br />as package treatment plants and municipal drainfields. This <br />should include discussion of allowable land uses, installation <br />requirements, management requirements and local <br />government responsibilities. <br />Municipalities with a locally owned and operated wastewater <br />treatment plant must include the following additional information: <br />• Projected wastewater flows in 2010, 2020 and 2030. <br />• Local objectives, policies and strategies for preventing <br />and reducing excessive infiltration and inflow including a <br />discussion of sump pumps and drain tile in the local sewer <br />system. <br />• Proposed timing and financing of any expanded or new <br />treatment facilities. <br />• Copies of facility planning reports for the upgrading of the <br />treatment plants. <br />April 2008 5 -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.