Laserfiche WebLink
CONTRACT CHANGE ORDER NO. 1 <br /> <br />Project: <br />Date: <br />Contractor: <br /> <br />Division C, 1998 Street Maintenance Program <br />October 13, t998 <br />W.B. Miller, Inc. <br /> <br />Description of Change: <br /> <br />Furnish and place topsoil 2 inches in depth and 2 feet wide along non-curbed roadway overlayed <br />in the above project. This represents an estimated mileage of 7.8 miles. <br /> 500 cubic yards of topsoil @ $15.00/cubic yard = $14,100.00. <br /> <br />Justification: <br /> <br />This work was not included in the original scope of work as this project element was performed <br />by the City's Public Works Department in past programs. Due to the high priority nature of this <br />work on MSA Streets and the heavy workload of the Public Works Department, this work is <br />requested to be added to the scope of the Contractor's work. <br /> <br />Chang.e in Contract Amount: <br /> <br />Original Contract Amount <br />Change in Contract Due to Change Order No. 1 <br />Total Contract Including Change Order No. 1 <br /> <br />$326,593.03 <br /> 14,100.00 <br />$340,693.03 <br /> <br />This document will become a supplement to the contract and all provisions will apply hereto. <br /> <br />Recommended: <br /> <br />City Engineer Date <br /> <br />Accepted: <br /> <br />Approved by: <br /> <br />Contractor <br /> <br />Date <br /> <br />Owner Date <br /> <br />/20 <br /> <br /> <br />