Laserfiche WebLink
Mr. Steve Jankowski <br />March 21, 1997 <br />Page 2 <br /> <br />5. The radii at TH 47 and CSAH 5 must be increased to 50' to accommodate trucks. <br /> <br />The preliminary layout must be prepared according to the enclosed Tech Memo 91-29-ES-05. This <br />includes roadway dimensions, proper color coding, signal system mast arms, traffic volumes, etc. <br />as outlined in the tech memo. It is assumed at this time that the layout will require a Level II <br />approval. <br /> <br />If you have any questions or require clarification on the layout or the comments, please call either Larry <br />Erb (582-1384) or myself. <br /> <br />Sincerely, ,; . f /. <br /> <br />Cooperative Agreement Engineer <br />Metro Division <br /> <br />Enclosures: <br /> <br />Tech Memo 91-29-ES-05, Layout Review Process <br />Figure 5-2.04D of the new Mn/DOT Road Design Manual <br />Modified Layout <br /> <br />CC: <br /> <br />Bob Brown, Mn/DOT-Water's Edge <br />Greg Coughlin, Mn/DOT-Water's Edge <br />Sue Mulvihill, Mn/DOT-Oakdale <br />Mukhtar Thakur, Mn/DOT-Water's Edge <br />Dennis Eyler, SRF <br />Project File <br /> <br /> <br />