Laserfiche WebLink
-2- <br /> <br />Calculations must be provided along with a grading and erosion control plan that <br />delineates the drainage areas. The post-developed rate/volume of runoff must <br />not: exceed the pre-developed rate/~olume of runoff for the 10-year, 24-hour <br />storm, utili~ng the ~SCS Method" with a curve number determined using Group <br />C soils as a minimnm_ <br /> <br />If aU}' work is to be performed within the County Right-of-Way, a permit is <br />reqmred and must be obtained prior to the commencement of any construction. <br />Contact Roger Butler, Traffic Engineering Coordinator for this department, for <br />further information regarding the permit process. <br /> <br />Thank you,,for the oppo~mity to comment. Please keep ~his department informed ~ <br />plans for this site pro~ess. Any traffic control devices required within the CSAH 5 -. <br />right-of_-wa~ for this site will be determined and installed by Anoka County. Since this <br />site is also adjacent to a Tr~_mk Highway, it must also be reviewed by the Minnesota: <br />Departmeat of Transportation. Feel free to contact me if you have any questions. <br /> <br />Sincerely, <br /> <br />Jane Pemble <br />Traffic Engineer <br /> <br />xc: Roger Butler, Traffic Engineering Coordinator <br /> <br />xc: Cyrus Knutson, Mn/DOT Planning <br /> <br />xc: Sylvia Frolik, City of Ramsey <br /> <br />dmh/1LORDLFE <br /> <br /> <br />