My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/14/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 02/14/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:33:20 PM
Creation date
9/26/2003 10:00:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/14/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br /> l <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br /> <br />P~CEIVED <br />r.-:~ _ 7 1.995 <br /> <br />,l~'d ............ <br /> <br />MI. Stevell Jaglkowski, PE <br />City Engineer: <br />City of Ramsay <br />15153 Nowth~n Boulevard N.W. <br />Ramsey, MN ,55303 <br /> <br />RE: Requ0st for Proposal for Engineering Services for the Extension of <br /> Sewe~ and Water Trunks to Service Ramsey Elementary School <br /> <br />Dear MI. Janl~owski: <br /> <br />RLK Associates, Ltd. is pleased to submit this proposal for design services for the extension of <br />sewer and wa~r trunks to service thc Ramscy Elementary School site. The following oudines the <br />basis of our proposal. <br /> <br />TASK 1 - BASIc SERVICES <br /> <br />A. PreparatiOn of plans and specifications for the extension of sanitary sewer and watermain: <br /> <br />Final design ar!cl, detailed plans will be completed based on the preliminaxy layout and review <br />comments received fi.om agencies and the City. We will work with the school board and their <br />engineers to determine the exact service requirements and utility locations within their site. RLK <br />staffhas recen ~fly complelext utility design for several large commercial and residential sites <br />requiring this ~s~!me coordination. <br /> <br />It is assumed tl~at RLK Assooiates will work with the City and the effected property owners to <br />develop a preIi~ alignment prior to any survey work being completed. It appears that from <br />discussions wi~ City staffthat the property owners will want the City to work around their <br />preferred align~ ent as such, this information should be known prior to the exact survey alignment <br />being completeil. <br /> <br />A_~r the prelin!ina~ sanitary sewer alignment is established by the City and the property owners, <br />RLK Associate~ recommends that thc proposed alignment area be mowed down to facilitate the <br />predesign surve[g and also the construction staking. Mowing down the tall grass and brash areas <br />will facilitate tl~c survey phases, and also save thc City money. The survey costs listed at the end <br />of this proposalS.~ therefore, assume that this prOCess will occur prior to any surveying being <br />completed. <br /> <br />Plan and profil0 sheets would be completed in accordance to the City's utility standards. Detailed <br />construction sp~c~ ifications will be prepared based on MN/DOT standard specifications and the <br />Standard Utilit~ Specifications as prepared by the City Engineer's Association of Minnesota, 1998 <br />edition. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.