My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 06/13/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:38:16 PM
Creation date
9/26/2003 11:23:26 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ESTIMATED CO~ <br /> <br />The estimated constv <br />included in Appendi: <br />project assessable, <br />waterman in 151 st A <br />overhead costs at 30' <br />indirect costs. This <br />these items determine <br /> <br />~TS <br /> <br />tction and project costs are summarized in Table 1. Detail cost estimates are <br />[ B. The estimated costs in Table 1 indicate those costs which are lateral or <br />md the incremental additional cost for installation of the 12-inch trunk <br />venue in place of a standard 8-inch lateral watermain. Table 1 also indicates <br />b of the construction costs, as an allowance for engineering, legal and other <br />~Ilowance is comprised of the following components, with the final cost of <br />d by actual conditions when each is completed. <br /> <br />Engineering i 10% <br />Staking and Igspection 7% .. <br />Fiscal and Legal 3% <br />Administratioh 5% <br />Contingencies 5% <br />Total 30% <br /> <br />The cost for trails is to be credited against the total park dedication in the amount of $6.00 per lineal <br />foot. An optional co~t is also included to provide a 20-foot-span prefabricated bridge to cross the <br />County ditch. This cbst is not included in the project totals. <br /> <br />TABLE 1 <br /> <br />ESTIMATED PROJECT COSTS <br />FOX KNOLL I.P. g95-15 <br /> <br />Improvemen!: <br /> <br />Sanitary Sewer <br />Watermain <br />Storm Sewer <br />Streets <br />Trails <br />Total Constructio~ Cost <br /> <br />Overhead Costs @ 3~% Const. Cost <br />Total Project Cost <br /> <br />Project Trunk <br />Assessable Attributable Total <br /> <br />$ 35,300 $ 0 $ 35,300 <br />35,300 5,100 40,400 <br />11,800 0 11,800 <br />29,700 0 29,700 <br />8.800 0 8.800 <br />$120,900 $5,100 $126,000 <br /> <br />36,300 1,500 37,800 <br />$157,200 $6,600 $163,800 <br /> <br />The total estimated p~ject assessable costs are proposed to be divided equally amongst each of the <br />22 lots being developed, regardless of the frontage of the individual properties. The oversizing <br />trunk charges for thc watermain will be paid from water trunk charges, which is a uniform rate <br />charge to all users. The current 1995 trunk charge rate for sanitary sewer and water is $1539 per <br />residential connectiorh. This project will assess $33,858 in trunk charges and expend $6,600 from <br />the trunk fund. City policy has previously allowed the recovery of the total assessable cost over a <br />five-year period for ~ew developments. The assessment policy utilizes an interest rate of 2% over <br />the prime rate in effect at the time the assessment resolution is passed. The interest rate to be <br />charged on this proj~t is estimated to be 11%. <br /> ? <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.