Laserfiche WebLink
Subdivision - Design Standards § 9.50.30 <br /> <br />9.50.50 Construction of Improvements <br /> <br /> Subdivision 1. General conditions. Upon receipt of preliminary <br />approval of a plat by the Council and prior to Council approval of the final plat, the <br />subdivider shall make provision in the manner hereinafter set forth for the installation, at <br />the sole expense of the subdivider, of such improvements as shall be required by the City, <br />which improvements may include, but are not limited to, streets, sidewalks, public water <br />systems, sanitary sewer systems, surface and storm drainage systems and public utility <br />services. The installation of said improvements shall be in conformity with City approved <br />consa'ucfion plans and specificatigns and all applicable City standards and this code. <br /> <br /> Subd. 2. Basic improvements required. <br /> <br /> a. Policy. It is hereby declared to be the policy of the City to, as <br /> soon as practicable after approval of the proposed plat, require <br /> the installation of all of the following improvements within the <br /> subdivision: <br /> 1. Stage I Improvements: Major construction items <br /> needed to be constructed with a plat prior to issuance of <br /> any building permits: <br /> <br />(a) Trunk Sanitary Sewer (urban) <br />(b) Trunk Watermain (Urban) <br />(c) Trunk Storm Drainage Facilities (when specified) <br />(d) Source and Storage (Future Water Facilities) <br />(e) Lateral Sanitary Sewer (Urban) <br />(f) Lateral Watermain (Urban). <br />(g) Lateral Storm Sewer and/orPonding <br />(h) Streets <br />.(i) Concrete Curb and Gutter (Urban) <br />(j) Street Traffic Control Signs <br />(k) Easement Acquisition <br />(I) Lot Grading <br />(m) Trail and Park Development <br />(n) Street Lights <br />Stage II Improvements: Minor and miscellaneous <br />items required prior to acceptance by the City: <br />(a) Inspection <br />(b) Street Striping and Signing <br />(c) Street Sweeping <br />(d) Sidewalk (Optional) <br />(e) Seal Coating (or escrow for) <br />(f) Adjusting Water Shut-Off Boxes (Urban) <br />(g) Maintenance of Storm Water Sewer and Facilities <br />(h) Boulevard Sodding <br /> <br /> <br />