Laserfiche WebLink
-2- <br /> <br />rate/volume of runoff must not exceed the pre-develop%d,, rate/volume of runoff <br />for the 10-year, 24 hour storm, utilizing the "SCS Method vnth a curve number <br />determined using Group C soils as a minimum. ' <br /> <br />A permit for work'within theCounty Right-of-Way is required and must be <br />obtained prior to the commencement of any construction. Contact Roger Butler, <br />Tr~f~c Engindering Coordinator for this department, for further information <br />regarding the permit process. <br /> <br />It sho .uld be noted that residential land use adjacent to highways will usually <br />r~sult m complaints regarding traffic noise. Tr~c noise at this location <br />could exceed Noise Standards established by the US Department of Housing and <br />Urban Development and the Minnesota Pollution Control Agency. Anoka County <br />policy regarding new developments adjacent to existing County Highways prohibits <br />the expenditure of highway funds for noise mitigation .measures. The City and/or <br />the Developer should assess the noise situation and take any action deemed <br />necessary to rnln~mlze associated impacts at this site from any traffic noise. <br /> <br />Thank you for the opportunity to comment. Please keep th~s department informed, as plans <br />for this site are developed further. The City or the Developer should contact me when <br />construction of the new city streets are near completion, sot that stop sign installations at <br />CR 56 and CR 116 can be coordinated by this department. Feel free to contact me ffyQu <br />have any questions. <br /> <br />Tr:~f~ c Engineer <br /> <br />xc: <br />xc; <br /> <br />Roger Bufler~.Traffic Engineering Coordinator <br /> <br />Skip Anderson, County Surveyor <br /> <br />Sylvia Frolik, City of Ramsey <br /> <br />dm /m LVO <br /> <br /> <br />