My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/09/1994
Ramsey
>
Public
>
Agendas
>
Council
>
1994
>
Agenda - Council - 08/09/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:09:24 PM
Creation date
10/14/2003 7:59:55 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/09/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hakanson <br />Anderson <br />Assoc.,inc. <br /> <br />ZZ2 tv~onroe Street <br />Anoka, Minnesota 55303 <br />612.1427- 58G0 <br />Fax 612_/4Z?-3401 <br /> <br />MEMO <br /> <br />TO: <br /> <br />FROM: <br /> <br />RE: <br /> <br />DATE: <br /> <br />FILE: <br /> <br />Steve Jankowski, City Engineer <br /> <br />Peter Raatikka <br /> <br />Status of Sunwood Drive <br /> <br />August 3, 1994 <br /> <br />RA3:0t-131 <br /> <br />As requested, I have prepared this memorandum to update you on the status of the <br />Sunwood Drive project. <br /> <br />Currently we are working on providing additional information requested by the DNR <br />for the DNR permit application. This permit a]ong with the U.S. Army Corp. of <br />Engineers permit was applied for on April 28, 1994. On June 3, t994, preliminary <br />plans were submit-led to DNF~ at their request to assist them in their permit review. <br /> <br />We will be submitting to them additional information to try to justify the need for <br />filling the wetland later this week. If the DNR agrees with the justification, the permit <br />could be issued in two to three weeks. If the DNR does not agree to the filling of the <br />wetland, bridging may be required. <br /> <br />Upon notification of a DNR permit, we will complete the final plans for the east <br />portion of Sunwood Drive and submit them to Mn/DOT for review. If the permit is <br />issued by September 1, 1994, we would anticipate bidding the project early in <br />October. This would allow for rough grading, utility construction and the wetland <br />crossing to be completed this fall and winter and final street construction and <br />restoration to be completed by mid-June of 1 995. <br /> <br />On the west side of Sunfish Lake Boulevard, we have cqmpleted final grades and <br />staked the street. Waste Management is scheduled to start the rough grading on that <br />portion of the street this month. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.