My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/22/1994
Ramsey
>
Public
>
Agendas
>
Council
>
1994
>
Agenda - Council - 08/22/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:09:33 PM
Creation date
10/14/2003 8:29:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/22/1994
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 25 <br /> <br />Blackberries are of the genus Rubus. The only Rubus species currently on <br />Minnesota's endangered, threatened or special concern plant list is Rubus <br />chamaemorus (Ctoudberry). This species has. been found in Lake Count;,, <br />Superior National Forest and prefers bog habitats. The plant is distinctive due <br />to its notable lack of prickles or bristies. Six species of blackberries are <br />recognized in Minnesota, none of which are endangered, threatened, or of <br />special concern. Rubusfotiofiorus(shownon Fig. i3) is not currently listed as <br />endangered, threatened, or of special concern. <br />Source: Minnesota's Endanc~ered FIora and Fauna U. of M. Press. B. Coffin and <br />L. Pfannmuller, editors. 1 98S. <br /> <br />P 4. Item 27 Previous comments Item 16 and 25. <br /> <br />Previously addressed, <br /> <br />P i-5. Fiaures 2.3..4,5 show different alionments <br /> <br />Figure A is a City-wide mao illustratin~o genera! alignments of major <br />transportation corridors. Figures 2, 3, 5 are vastly different in scale and level <br />of detail. As more detailed maps are used, the alignments may vary to avoid <br />constraints or take advantage of terrain or other factors within the general <br />corridor. <br /> <br />xxi <br /> <br />- 23 Roadway S~)eed/Desion/Enforcement <br /> <br />This comment relates to enforcement more so than design issues. By the <br />commentator's own logic a 30 mph design could allow some traffic to move <br />through the area at speeds of 45-50 mph. The standard design speed for this <br />type of roadway is 40 mph. <br /> <br />P 13 - Information and plans were not reviewed <br /> <br />This roadway extension has been proposed since 1974 (Road & Bridge Minutes <br />1/18/94). The transportation plan (with the general alignment shown) was part <br />of the comprehensive plan update in 1989-90. Alternatives were reviewed <br />with the City Council on 1/18/94 and further discussions of the roadway by <br />each body occurred 4/12/94. <br /> <br />MC COMMENTS fMAY 9, 1994) <br /> <br />MC comments were provided with respect to three issues; 1) Surface Water, <br />2) Stormwater Runoff and, 3) Ramsey- Dayton Mississippi River Corridor. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.