Laserfiche WebLink
II. <br /> <br />SUMh~ARY OF iSSUES <br /> <br />Wetlands and Wildlife Habitat <br /> <br />The pem~anent loss of at least 6.3 acres of wildlife habitat to road construction cannot be <br />avoided. As a par~ of the developing metropolitan region, loss of wildlife habitat is <br />virtually unavoidable. The effort, thus, will be to mitigate to the extent practicable by <br />creating a new wetland basin and/or enhancement of existing wetlands on a "no net loss" <br />indicates that a potential project would be creation of a wetland area adjacent to wetland <br />117P. As previously indicated, the City will coordinate efforts with DNR, the Corps of <br />Engineers, and the U.S. Fish and Wildlife service to identify an appropriate mitigation <br />project. <br /> <br />Dust, Noise <br /> <br />The projecl will be designed and administered with sufficient controls placed on the <br />contractor to avoid significant impacts during the construction period. Noise impacts f-rom <br />construation activity will be limited by requiring that the contractor use equipment in good <br />operarioi~al condition and that they comply with OSHA, State and local requirements. <br /> <br />Long term impacts from noise associated with traffic are expected to be well within <br />acceptable levels. No significant impacts are expected and no special measures are <br />anricipafect. <br /> <br />Storm Water Runoff <br /> <br />Increasod impervious surface will increase the rate of runoff over existing conditions. <br />Approximately one half of the right-of-way will be paved. No significant alteration of the <br />existing drainage pattern is proposed. Runoff will be collected in the road ditches and <br />discharged to wetlanc~s in the viciniU of the project. No significant impacts are anticipated <br />as a result. -' <br /> <br />Ramsey,Dayton Mississippi River Crossing: <br /> <br />it is recognized that the Metropolitan Council has not committed its support to this <br />crossing5 Nevertheless, the crossing is an element of the communities, comprehensive <br />plans asiwell as Anoka County's comprehensive transportation plan. The approach to the <br />Ramsey Side of rte river crossing has ~en protected through the platting process providing <br />a corridor to link with Trunk Highway 10. Thus, while much work needs to be done, the <br />commumty will continue to work to assure that this important link can become a reality. <br /> <br />Endangered Species: <br /> <br />The proposed alignment for this roadway does not affect any known endangered, <br />threatened, or of special concern species. <br /> <br />AlternatiVe Alignments: <br /> <br />This roadway has been a part of the City's transportation plan since 1974. All of the <br />community's long range planning west of Krypton Street is based on the connection of this <br />proposed collector to provide access to these areas. The pro,iected ADT for existing and <br />proposed developments in this area is 5000 to 5800 ~Sps per da),. This volume necessitates <br />a collector street since alternative use of local residential streets would accommodate a <br /> <br /> <br />