My WebLink
|
Help
|
About
|
Sign Out
Home
08/22/94
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1994
>
08/22/94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 4:28:29 PM
Creation date
10/20/2003 10:13:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
08/22/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. <br /> <br />A. <br /> <br />SUMMARY OF ISSUES <br /> <br />Wetlands and Wildlife Habitat <br /> <br />The permanent loss of at least 6.3 acres of wildlife habitat to road construction cannot be <br />avoided, iAs a part of the developing metropolitan region, loss of wildlife habitat is <br />virtually unavoidable. The effort, thus, will be to mitigate to the extent practicable by <br />creating a[new wetland basin and/or enhancement of existing wetlands on a "no net loss" <br />indicates that a potential project would be creation of a wetland area adjacent to wetland <br />117P. Aslpreviously indicated, the City will coordinate efforts with DNR, the Corps of <br />Engineers, and the U.S. Fish and Wildlife service to identify an appropriate mitigation <br />project. <br /> <br />Dust, Noise <br /> <br />The project will be designed and administered with sufficient controls placed on the <br />conu'actor.~to avoid significant impacts during the construction period. Noise impacts from <br />constructi~.n activity will be limited by requiring that the contractor use equipment in good <br />operationa!l condition and that they comply with OSHA, State and local requirements. <br /> <br />Long term impacts from noise associated with traffic are expected to be well within <br />acceptable levels. No significant impacts are expected and no special measures are <br />anticipated. <br /> <br />Storm Water Runoff <br /> <br />Increased 5impervious surface will increase the rate of runoff over existing conditions. <br />Approxim~ately one half of the fight-of-way will be paved. No significant alteration of the <br />existing drainage pattern is proposed. Runoff will be collected in the road ditches and <br />discharged to wetlands in the vicinity of the project. No significant impacts are anticipated <br />as a result, " <br /> <br />Ramsey-Dayton Mississippi River Crossing: <br /> <br />It is recognized that the Metropolitan Council has not committed its support to this <br />crossing. :Nevertheless, the crossing is an element of the communities, comprehensive <br />plans as well as Anoka County's comprehensive transportation plan. The approach to the <br />Ramsey side of the river crossing has been protected through the platting process providing <br />a corridor~to link with Trunk Highway 10. Thus, while much work needs to be done, the <br />communitS, will continue to work to assure that this important link can become a remit3,. <br /> <br />Eo <br /> <br />Endangered Species: <br /> <br />The proposed alignment for this roadway does not affect any known endangered, <br />threatened, or of special concern species. <br /> <br />Alternative Alignments: <br /> <br />This roadway has been a part of the City's transportation plan since 1974. All of the <br />communit?'s long range planning west of Krypton Street is based on the connection of this <br />proposed Collector to provide access to these areas. The projected ADT for existing and <br />proposed developments in this area is 5000 to 5800 nips per day. This volume necessitates <br />a collector street since alternative use of local residential streets would accommodate a <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.