Laserfiche WebLink
4.40 Water a~d Sewer Utilities <br /> <br />4.40-20 Ol~nlng Hydrants. No person, except authorized City employees or a <br />member of the I~ire Department in case of fire, shall be allowed [o open'any fire <br />hydrant in the water system for any purpose whatsoever, without first securing <br />a[xthorization frown the City. <br /> <br />4.40.21 Variances. The Council may permit variances from the strict <br />appliance of an3( of the provisions of this section if it is satisfied that there are <br />special circ,,mst~nces or conditions affecting the premises for which the variance <br />is requested an(] that the granting of such variance will not materlal]y affect <br />adversely healtH, safety or general welfare or public or private property. Any <br />variation permitted under this prox4sion must be noted on the permit. <br /> <br />4.50 <br /> <br />4.50.01 <br /> <br />Ramsefs Financing Poli ,. <br /> <br />steers <br /> <br />Subclivislon 1. In F.~$fing Pla~ Areas <br /> <br />a. M.S.A. Street <br /> il. Assess the cost of 50% of a typical residential street (normal <br /> construction) on a unit method or front foot basis. For the <br /> purpose of this paragraph, the cost of a "typical residential <br /> street" shall be defined as the cost determined annually <br /> based on the construction costs during that year for each type <br /> of street constructed to current City Standards. <br /> <br /> 2. Remainder of cost is paid by M.S.A. <br /> Residential Street <br /> <br />bo <br /> <br />Assess the total cost of initial construction on a unit method <br />or front foot basis. <br /> <br />Assess 50% of the cost for reconstruction/overlays on existing <br />bituminous street with the remaining 50% being assessed to <br />the City. <br /> <br />On Ai[SA streets which provide access to residential lots, <br />assess those lots 50% of the cost for the <br />reconstruction/overlays for a t.vpical residential street with <br />the remaining cost being paid by MSA funds. <br /> <br />Subd, 9_ In New Developments <br /> <br />a. Assess total cost on a unit method <br /> <br />Subdi 3~ Seal Coating <br /> <br />a. Assess total cost on a front foot or unit basis for the initial <br /> sealcoatin~ on City streets. <br /> <br />Page 60 <br /> <br />Printed 12/28/90 <br /> <br /> <br />