My WebLink
|
Help
|
About
|
Sign Out
Home
10/20/94
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Economic Development Commission
>
Agendas
>
1994
>
10/20/94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 2:52:00 PM
Creation date
10/21/2003 12:04:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Economic Development Commission
Document Date
10/20/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. <br /> <br />To a practical extent, the Planning and Zoning commission should adhere to <br />the policies o£ land acquisition, parks and open spaces and traitways <br />(greenbelts, waterways, bike trails, hiking trails, ski trails, snowmobile trails, <br />walkways, etc.) as recommended by the Park and Recreation Commission. <br /> <br />18. <br /> <br />As called for by the Mississippi River Critical Area Designation, a continuous <br />trail wilI be provided along the Mississippi River for pedestrian and bicycle <br />use. Where direct access is not possible, existing streets will be used as part <br />of the trail system and identified with signs. The proposed trail is identified <br />in Ordinance 89-11. <br /> <br />20. <br /> <br />A component of the City's trail system should be to provide neighborhood <br />access to developed parks while minimizing the number of major road crossings <br />and providing a trail system separate from roadways, <br /> <br />22. <br /> <br />In an effort to stretch park development funds, the city should aggressively <br />pursue park [and trail] development grant funds as available and other <br />alternative funding sources (e.g. tax increment financing and CDBG funds). <br /> <br />On review, the goals are complete and sufficient for the City's recreational trail <br />system, but inadequate in the area of commuter trails. The commuter trail system <br />should be designed to link residential areas with places of employment, shopping, <br />educational and social/community services, and transit facilities and services. The <br />commuter trail system could also be linked to the City's recreational trail system. <br /> <br />As part of the process for developing the Trail System element of the Comprehensive <br />Plan, the list of goals will be expanded to include commuter trails. Efforts will be <br />made to relate the commuter trail system to transit services and other alternative <br />travel modes. <br /> <br />NEED AND SPECIFICATIONS FOR TRAIL FACILITIES <br /> <br />Need <br /> <br />The 1991 Plan included a comparison of the City's trail facilities against facility <br />standards accepted in Minnesota. The comparison indicated the following: <br /> <br />mile of hiking trail needed for every 4,000 population <br />mile of nature or interpretive trail needed for every 2,500 population <br />mile of equestrian trail needed for every 3,000 to 6,500 population <br />mile of bicycle/jogging trail needed for every 2,000 population <br />mile of exercise trail need for every 7,500 population <br /> <br />Source: <br /> <br />Time Saver Standards for Landscape Architecture and KCMR Outdoor Recreational Study <br /> <br />With a forecast population of 14,600 cited in the 1991 Plan, the number of then <br />existing recreational trail facilities was found to be deficient. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.