Laserfiche WebLink
STORAGE <br />AREA <br />PAVEWENr <br />Redwood -Renville Counties <br />Redwood Falls, Minnesota <br />Redwood and Renville Counties hired Foth in 2008 to conduct an eval- <br />uation of their existing recycling collection and processing programs <br />with the intent of potentially developing joint recycling collection and <br />processing operations. <br />The assessment examined the demographics and population pro- <br />jections for the counties to provide estimates of future recyclable <br />quantities and composition. It was estimated that the counties <br />would generate approximately 3,000 tons per year. Current <br />and future recyclables collection approaches were analyzed, <br />including single and dual stream. Dual stream was the exist- <br />ing system and was the recommended future collection <br />method. <br />Conceptual processing facility approaches were identified with prelimi- <br />nary capital and operating costs for two different approaches a single <br />sorting line and a separate paper and container sorting line. Three <br />potenital sites were identified by Redwood County and the sites were <br />evaluated against pertinent criteria for the processing facility. <br />PROCESSING <br />AREA <br />RECEIVING <br />AREA <br />REDWOOD/RENVILLE COUNTIES <br />RECYCLING FACILITY - GENERAL SITE PLAN <br />so es <br />DATE: M' 2039 <br />C 40 <br />PREPARED 8YKY <br />O EC<ED BY: WAS I <br />PROJECT ID 08R028 <br />FIGURE NO, <br />5-1 <br />Recycling Drop -Off Center Analysis & Plan Development <br />City of Ramsey, MN —October 2012 <br />Institutional arrangements <br />were reviewed such as <br />different owner/opera- <br />tor options, joint powers <br />board formation, recy- <br />clable material flow mea- <br />sures, workforce develop- <br />ment opportunities, and <br />public education needs. <br />The counties have not yet <br />secured funding as state <br />grant funding was not <br />available. They recently <br />were awarded a grant <br />for $1 9 million from the <br />Minnesota DEED. Foth <br />is currently working with <br />the Counties to meet the <br />grant requirements lead- <br />ing to design and con- <br />struction of the recycling <br />facility. <br />*Foth <br />2-7 <br />