Laserfiche WebLink
Section 3 I Scope of Services <br />Lastly, as part of this task, SAIC will estimate a range of the total quantities of materials that the City <br />would expect to receive at the drop-off facility based on the selected primary material types and projected <br />household participation. This estimate will be used in developing the facility program plan in Task 3. <br />Task 3 - Conduct Facility Programming for the Recycling Drop-off Center <br />SAIC will develop a facility programming plan for the services needed at the Recycling Center based on <br />the evaluation of the current programs, SAIC's experience with solid waste facility development, and <br />discussions with City staff regarding the future needs for the facility. The facility programming plan will <br />address the various design and operating parameters of the potential drop-off facility. <br />Key non -site specific issues to be addressed would include, but not be limited to, the following: <br />• Site size and overall footprint; <br />• Building size and general facility layout; <br />• Traffic flow; <br />• Equipment (e.g., containers, rolling stock) needs; <br />• Hours of operation and staffing; and <br />• Other related issues. <br />It is anticipated that processing capabilities at the facility will be limited to the use of a baler, and will not <br />include sorting processes or equipment. <br />The Pahoa Transfer Station described above incorporated innovative and sustainable concepts into the <br />facility design by using recycled concrete from construction demolition sites in both construction and the <br />landscaping of the site, and integrated recycled glass and shredded tires into the landscape design. These <br />sustainability concepts could be considered as part of the facility programming for the City's recycling <br />drop-off center. <br />As part of the facility programming task, SAIC will prepare a non -site specific, conceptual level drawing <br />of the proposed recycling drop-off center. This rendering will be supported by a summary description <br />that addresses the key facility issues listed above. <br />Task 4 - Evaluate Options for Implementation <br />This task focuses on investigating the preferred arrangement of the public -private partnership for <br />implementing the development and long term operations of the recycling drop-off center. During the <br />scoping meeting, we will discuss the City's preference, if any, for a public —private partnership for the <br />implementation of the drop-off center. <br />This task also will involve identifying potential sites that would accommodate the proposed facility. <br />SAIC staff will discuss with the City potential sites owned by the City and their suitability for the <br />proposed drop-off center. In addition, potential sites identified through discussion with private vendors <br />will be discussed for their general suitability. <br />SAIC Energy, Environment & Infrastructure, LLC I 3-3 <br />