My WebLink
|
Help
|
About
|
Sign Out
Home
03/07/89
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1989
>
03/07/89
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 8:52:33 AM
Creation date
11/14/2003 11:22:17 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
03/07/1989
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-7- <br /> <br />The licensee shall implement the revised monitoring pro?am prepared by <br />Foth/Van Dyke and dated March 30, 19B7. This monitoring plan is amended <br />as follows: <br /> <br />The sampling frequency for wells lB, 6BB, and 11BB need only be once <br />per year. <br /> <br />Wells 2BBB, 29BB, 3DBB, and 3BBB ~hould shall be sampled three times <br />per year. <br /> <br />Well 3BBB, placed in the tunnel valley south of Well 34BB, should <br />.shall be included in the monitoring program. <br /> <br />The list of volatile organics set forth in the plan should shall also <br />include ~, 1-dichlQroethylene, methylene chloride, <br />l~l,2,2-tetrachloroethane, and 1,1,2-trichloroethane. <br /> <br />Preservation of phenolic samples with CaSO4 should shall be amended <br />to read CuSO4. <br /> <br />The sampling frequency of the private wells, PW 2, PW 92 and PW 93, <br />shall be increased to three times per year. <br /> <br />Water level measurements shall be taken and recorded, at the time of each <br />sampling event, from all monitoring wells and piezometers. <br /> <br />CLOSURE!POST CLOSURE FINANCIAL ASSURANCE <br /> <br />!. ~_~ The licensee shall comply with the closure/post closure plan dated <br /> April 30, 1987. The financial analysis set forth in this plan is amended <br /> as set forth in ~able I. <br /> <br />2__~..!~The licensee shall provide financial assurance for si~e operation,--'"~ <br /> closure work (as set.forth in Section-.V, s~bsectian 5..A,' ~, C, D, E, F, <br /> G,-H, ~, J,-L, and M of the Solid Waste Ordinance), surface drainage <br /> control, and closure period final cover and turf maintenance by <br /> / <br /> performance bond in the amount of $350,000. The licensee shall maintain / <br /> on site at least 60,395 yds. of acceptable final cover soil (36,895 yds. <br /> middle horizon and 23,500 yds. upper horizon) as set forth in the <br /> licensee's correspondence of July 23, 1987. Said soils shall be "~ <br /> protected from erosion and shall not be used except as may be //~ <br /> specifically approved by the Department. <br /> <br />3~ :~. The licensee shall provide up to $1,412,8~5 of financial assurance forl <br /> closure period needs not covered by the bond in item 12 above and post ~ <br /> closure period needs as set forth in Section II, subsection 8. B. (!) \ <br /> of the Solid Waste Ordinance and that this financial assurance be <br /> financed at the rate of $.~O/compacted gate yard and $.35/loose or <br /> uncompacted gate yard of solid waste received. This financial assurance <br /> sl~all be provided and amended quarterly, based upon an estimate/ <br /> <br />q! <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.