Laserfiche WebLink
Hakanson <br />Anderson <br />Assoc.,Inc. <br /> <br />Engineers, Surveyors & <br />Landscape Architects <br /> <br />September 25, 1989 <br /> <br />Mr. Ron Hetlund <br />Parks & Recreation Commission <br />Ramsey City Hall <br />15153 Nowthen Boulevard N.W. <br />Ramsey, MN 55303 <br /> <br />Re: <br /> <br />Sketch Plan Review of Tooth Acres for <br />Park Dedication Requirements <br /> <br />Dear Mr. Hetlund: <br /> <br />We have reviewed the proposed sketch plan for park dedication <br />requirements. The proposed sketch plan indicates that the total <br />gross land area is 108 acres. There are 41.7 acres proposed <br />industrial and the remaining 66.3 acres are proposed to be zoned <br />residential with 21 residential lots. <br /> <br />Park dedication requirements within this area are for a segment of <br />the right-of-way for the Mississippi River Regional Trail Corridor. <br />The sketch plan indicates a 75' right-of-way for the trail corridor <br />comprising approximately 4.4 acres. <br /> <br />Based on the current park dedication ordinance, park dedication <br />requires 5% of the industrial land acreage, and 10% of the <br />residential land acreage based on the proposed densities. A <br />combination of land and cash in lieu of may be required. Based on <br />this formula, 8.72 acres of land or cash in lieu of are required <br />for park dedication. <br /> <br />It is recommended that the 75' trail right-of-way be accepted and <br />that cash for the balance be accepted for the equivalent of 2.09 <br />acres of industrially zoned land and 2.23 acres of residentially <br />zoned land. <br /> <br />222 Monroe Street <br />Anoka, Minnesota 55303 <br /> <br />612/427-5860 <br /> <br />Fax 612/427-3401 <br /> <br />Eugene J. Hakanson, P.E_ <br />James M. V~nter, LS. <br />Lawrence G. Koshak, P.F_ <br />Peter I~ Raatikka, P.L <br /> <br /> <br />