My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/25/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 06/25/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:16:29 AM
Creation date
6/26/2013 4:10:15 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/25/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
802
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enterprise Park to Crooked Lake 115 kV Transmission Line March 2012 <br />Environmental Assessment <br />The entire width of the transmission line right-of-way will need to be cleared of tall - <br />growing vegetation that could potentially grow into the conductors. <br />The Applicant has stated it will replace or compensate landowners for any impacts to <br />landscaping (lawn, gardens, trees, etc.) through negotiations with each individual <br />landowner. <br />The Applicant has stated it is working with the city of Ramsey park staff on avoiding, <br />minimizing, or mitigating the impacts of any tree clearing in River Bend Park. <br />In accordance with MnDNR guidance on invasive species control, the Applicant has <br />stated it will incorporate the following BMPs during construction and operation of the <br />transmission line:: <br />• Before arriving at a work site, the Applicant will inspect for and remove all <br />visible plants, seeds, mud, soil, and animals from construction/maintenance <br />equipment. <br />• Before leaving a work site, the Applicant will inspect for and remove all visible <br />plants, seeds, mud, soil and animals from construction/maintenance equipment. <br />• Before leaving an aquatic work site, the Applicant will drain water from any <br />equipment, tanks, or water -retaining components of construction /maintenance <br />equipment. <br />• After working on infested waters or waters known to harbor pathogens of <br />concern, the Applicant will clean and dry equipment prior to using in locations <br />not known to be infested with species or pathogens present at the last location <br />visited. <br />5.2.5. Fauna <br />The Project would be located primarily along existing road ROWs in a developed, <br />suburban environment. In general, wildlife near the Project consists of birds, mammals, <br />fish, reptiles, amphibians, and insects, typical of a suburban developed area. No State <br />Wildlife Management Areas are within the Project area. <br />Construction of new transmission lines can affect fauna through temporary impacts, <br />permanent impacts, and avian -specific impacts. Temporary impacts include <br />displacement and habitat alteration caused by temporary disturbances and noise <br />associated with construction activities. Such impacts are most likely to affect fauna at the <br />proposed structure locations where activity would be most intense. Similarly, staging and <br />stringing areas also have the potential to temporarily impact fauna within the Project <br />construction area. Such activities have the potential to impact small birds (e.g., eggs or <br />nestlings) and small mammals that may be unable to avoid equipment. Many wildlife <br />species would likely avoid the immediate area during construction. The distance that <br />49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.