Laserfiche WebLink
I <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br /> <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />(c) Borrow Activity - Three years from the earlier of the date on <br /> which evidence of the res:oration bond identified in Paragraph 12 <br /> hereof has been transmitted to, reviewed and accepted by the City <br /> or July 1, 1989. Activity in the West Borrow Area shall be <br /> limited to one calendar year from commencement of operations in <br /> that area, the commencement date being at the sole discretion of <br /> WMMI. <br /> <br />The conditions of this permit are as follows: <br /> <br />LANDFILL PLANS AND SUBMITTALS <br /> <br />WI<MI shall construct, operate and maintain the facility in <br />accordance with this CUP and incldding supporting documentation as <br />follows: <br /> <br />Engineering Plans <br /> <br />. Drawing No. A-1 Preliminary Site Plan dated June, 1988. <br />· Drawing No. B-1 East and West Borrow Area dated July, 1988. <br /> <br />· Drawing No. B-2 Rough Grading Plan dated July, !988. <br />· Ramsey Ski Hill Development Plan East and West Borrow Area <br /> Plan - Detailed Desoription. <br />. Drawing - site Final Grades dated October, 1988. <br /> <br />· Drawing - North 80 Borrow Area dated October, 1988. <br /> <br />BORROW ACTIVITIES <br /> <br />Vecetation.' Existing tree and ground cover in the borrow and <br />buffer areas shall be preserved to the extent feasible, maintained <br />and supplemented by selected cutting, transplanting and replanting <br />of trees, shrubs and other ground cover along all set back areas. <br /> <br />Limits of Excavation. No Borrow Activity shall be conducted <br />beyond the limits for which this CUP is granted and as illustrated <br />on the No~h 80 Borrow Area plan dated October, !988. <br />Specifically, no Borrow Activity shall take place within four <br />hundred (400) feet of the western boundary of the property legally <br />described in Exkibit B attached hereto. <br /> <br />Landfill and Borrow Hours of Ooeration. Th~ hours of the landfill <br />ooera~ion shall be ~ ~' ' <br /> . __m_~e= ~o 7:00 a.m. to 8:00 p.m. Monday <br />through Saturday, no operation on Sundays. The hours of the <br />borrow operation shall be limited to 7:00 a.m. to 6:00 p.m. Monday <br />through Saturday, no operation on Sundays; provided that the hours <br />of the borrow operation may be extended to 8:00 p.m. Monday <br />through Friday during periods of--restoration of the borrow areas. <br /> <br />Dust Control. Dust created by landfill or borrow activities shall <br />be controlled by appropriate means bv the proper~y owner, i= it <br />is not possible to con~ro! the dust on any given day, the <br />opera~ion shall cease on nhat day. If, in the opinion of the City <br />Engineer, the dust created by the operation is excessive, '~= <br />ooeration, shall cease u~...__ the dus~ _~rob!~-.., is abated. <br /> <br /> <br />