My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 12/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:41:17 AM
Creation date
12/11/2013 10:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Rigidly close openings left in the formwork. <br />3. Wet wood forms sufficiently to tighten up cracks. Wet other material <br />sufficiently to maintain workability of the concrete. <br />4. Use only clean tools. <br />B. Conveying: <br />1. Perform concrete placing at such a rate that concrete which is being <br />integrated with fresh concrete is still plastic. <br />2. Deposit concrete as nearly as practicable in its final location so as to avoid <br />separation due to rehandling and flowing. <br />3. Do not use concrete which becomes non -plastic and unworkable, or does <br />not meet required quality control limits, or has been contaminated by <br />foreign materials. <br />4. Remove rejected concrete from the job site. <br />C. Placing concrete in forms: <br />1. Deposit concrete in horizontal layers not deeper than 24", and avoid <br />inclined construction joints. <br />2. Remove temporary spreaders in forms when concrete has reached the <br />elevation of the spreaders. <br />D. Placing concrete slabs: <br />1. Deliver concrete with maximum slump. <br />2. Deposit and consolidate concrete slabs in a continuous operation, within <br />limits of construction joints, until the placing of a panel or section is <br />completed. <br />3. Bring slab surfaces to the correct level with a straightedge, and then strike <br />off. <br />4. Use bullfloats or darbies to smooth the surface, leaving the surface free <br />from bumps and hollows. <br />5. Do not sprinkle water on the plastic surface. Do not disturb the slab <br />surface prior to start of finishing operations. <br />3.6 CONSOLIDATION <br />A. General: <br />1. Consolidate each layer of concrete immediately after placing, by use of <br />internal concrete vibrators supplemented by hand spading, rodding, or <br />tamping. <br />2. Do not vibrate forms or reinforcement. <br />3. Do not use vibrators to transport concrete inside the forms. <br />4. Comply with ACI 309. <br />3.7 JOINTS <br />A. Construction joints: <br />03300-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.