My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/25/1990
Ramsey
>
Public
>
Agendas
>
Council
>
1990
>
Agenda - Council - 09/25/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:01:41 AM
Creation date
12/9/2003 9:15:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/25/1990
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surfacinq of Work Areas. Ail equipment maneuvering areas, <br />driveway areas, access and perimeter roads shall be surfaced <br />with 6" of Class V or wood chips. Use of processed tire chips <br />is prohibited for surfacing material. <br /> <br />Outside Storage of Materials and Equipment. The outside <br />storage of debris or materials not used in the operation and <br />inoperable vehicles and equipment shall not be permitted. <br /> <br />Hours of Operation. The hours of the yard waste composting <br />operation shall be limited to 7:00 a.m. to 8:00 p.m. Monday <br />through Saturday provided, however, that use of mechanized <br />equipment shall not extend beyond 6:00 p.m. There shall be <br />no operations on Sundays and legal holidays. WM/~I at its <br />discretion may schedule a lesser number of hours of operation <br />within these limits. <br /> <br />Control of Operations. Ail hauling, shredding and other <br />activities incidental to the composting operation shall be <br />conducted in conformance with state and federal regulations <br />and in accordance with the applicable requirements of the <br />Performance Standards of the City Code (Section 170.017). <br />Operations must be conducted so as to minimize noise, safety, <br />odor, dust, visual impacts or other nuisance concerns to <br />adjacent residential properties. <br /> <br />On-Site Fire Protection. WMMI shall have available on-site <br />sufficient fire fighting materials which at a minimum shall <br />be no less than 100 cubic yards of sand, 3,200 gallon capacity <br />tanker with water extinguishers on each piece of equipment <br />such that advance efforts can be made in extinguishing a fire <br />either by WM~I personnel or City forces. WMMI shall provide <br />a safety communications line at the site at all times during <br />the term of this CUP when operating equipment at the site. <br /> <br />Pest Control. Insects, rodents and birds on the site shall <br />be controlled and exterminated as needed and additional <br />control may be directed by the City Inspector subject to all <br />applicable laws, rules and regulations. <br /> <br />Traffic. WM/~I's yard waste processing and haul vehicles shall <br />utilize U.S. Highway 10 and Sunfish Lake Boulevard (County <br />Road 57) exclusively when traveling to and from the Site. <br />WMMI shall communicate and attempt to ensure that non-owned <br />vehicles traveling to the Site utilize these same roads. <br />Vehicles with origination points or service stops in the City <br />may utilize local roads as necessary. <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.