My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 02/13/2014
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2014
>
Agenda - Parks and Recreation Commission - 02/13/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:00:19 PM
Creation date
3/14/2014 9:23:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
02/13/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Layout (size, type and location summary) will be included in the preliminary design <br />plan set. <br />• Prepare a draft index of required construction specifications. <br />• Prepare the Preliminary Cost Estimate for the work described in the preliminary <br />design plans based on estimated quantities. <br />• Typical full-size plan sheet scales will be as follows: <br />Plan and Profile: 1 inch = 20 feet <br />• Reproduce and distribute the plans (half-size) to the City, MnDOT, Metropolitan <br />Transit, BNSF, utility companies and other stakeholders for review two (2) weeks <br />prior to the preliminary design review meeting. <br />N. Preliminary Design Review Meeting <br />• Organize and conduct the Preliminary Design Review meeting. <br />• Prepare Preliminary Design Review meeting minutes. Distribute minutes, approved <br />by the City, as directed. <br />• Resolve design questions raised in the Preliminary Design Review meeting in <br />cooperation with the City. Document the decision and transmit the documentation <br />to the City for approval. <br />• Submit a list of all deviations from standard design criteria along with the written <br />justification for each one. <br />• Obtain concurrence from affected agencies or utility companies. <br />O. Preliminary Public Information Meeting: Conduct an informal project open <br />house for the project to inform area property and business owners of the project progress <br />and project features. TOD PUBLIC MEETING REQUIREMENTS HERE. Fully document <br />the results for City decision makers. <br />P. Project Consensus: The Consultant must work closely with all parties to build a <br />solid consensus for the project features leading up to Final Design. <br />Section 8. Final Design and 'Pre -Construction' Phase <br />A. The Consultant will develop a final design that will be the complete framework for a <br />future bid package in accordance with City requirements and the requirements for federally - <br />funded projects. Major elements will include: <br />• Design Coordination <br />• Geotechnical Engineering <br />• Structural Design (Structural design will include an Independent Design, Detail, and <br />Quantity Check per MnDOT Bridge Design) <br />• Civil Engineering (Roadway and Drainage) <br />• Site Development / Urban Design <br />• Traffic Engineering <br />• Right -of -Way <br />• Utilities <br />• Electrical Engineering <br />• Project and Structure Phasing <br />• Final Proposed Plans, Specifications and Cost Estimate <br />• Final Design Review Meeting with affected agency representatives <br />RFP 8 <br />Mississippi Skyway <br />
The URL can be used to link to this page
Your browser does not support the video tag.