My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/16/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 12/16/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:58:39 PM
Creation date
12/12/2003 3:34:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/16/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hakanson <br />Anderson <br />Assoc., Inc. <br /> <br />3601 Thurston Avenue, Suite 101, Anoka, MN 55303 <br />Phone: 763/427-5860 Fax: 763/427-0520 <br /> <br />December 9, 2003 <br /> <br />Leonard Linton <br />City of Ramsey <br />15153 Nowthen Blvd. NW <br />Ramsey, MN 55303 <br /> <br />Re: Amendment to November 19, 2003 Elmcrest Park Improvement Design Service PropoSal <br /> <br />Dear Mr. Linton: <br /> <br />As discussed with you and Mr. Riverblood on December 8, 2003, Hakans°n Anderson <br />Associates, Inc.. is pleased to amend our proposal as requested and to provide you with a list of <br />hourly rates. <br /> <br />Based on our meeting, the scope of services would include engineering and surveying for the <br />design and construction for parking areas, paths or trails, streets/access roads, storm sewer and <br />ponding and minimal restoration. The ball fields would be constructed at a later date and the <br />City would be responsible for planting trees on the site. Also, it is our understanding that you <br />wish to minimize ponding and storm sewers by constructing swales and rain gardens. <br /> <br />Following is a revised summary of estimated project costs based on the revised scope: <br /> <br /> Estimated <br /> Construction Estimated <br />Proposed Improvement Cost Design Cost <br />Parking Areas $235,000 $ 9,500 <br />Trails $132,000 $ 3,000 <br />Streets $128,000 $ 6,400 <br />Storm Sewer and Ponding $ 60,000 $ 5,500 <br />Restoration $ 30,000 $ 1,500 <br />Totals $585,000 $25,900 <br /> <br />Estimated <br />Construction <br />Technical Services <br />Cost* <br /> <br />$ 9,800 <br />$ 1,000 <br />$ 7,340 <br /> <br />$ 4,800 <br />$ 0 <br /> <br />$22,940 <br /> <br />*The construction tectmical services cost does not include the cost of construction observation, <br />which was originally estimated to be $13,000. Based on our discussion, this cost would be <br />included as a contingency to our contract so the City could utilize construction observation <br />services on an as needed basis. The $13,000 was based on a total of 200 hours of construction <br /> <br />observation at $65 per hour. <br /> <br /> Ovil & Municipal <br />Engineering <br />G:\OFFiCE\PROPOSAL\2OO3\Ehncrest\L¢onard.do~and Surveying for <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.