Laserfiche WebLink
Northwest Sewer Extension <br />City of Ramsey <br />TEMP. LIFT STATION AND FORCEMAIN <br />ITEM DESCRIPTION EST. QTY. UNIT UNIT COST TOTAL <br />1 LIFT STATION 1 LS $60,000.00 $60,000.00 <br />2 DRIVEWAY 1 LS $5,000.00 $5,000.00 <br />3 DEWATERING 1 LS $5,000.00 $5,000.00 <br />4 8" DIP FORCEMAIN 10000 LF $22.00 $220,000.00 <br />5 VACCUUM RELEASE MANHOLE 2 EA $3,000.00 $6,000.00 <br />6 FITTINGS 1540 LB. $1.50 $2,310.00 <br />7 CLASS 5 AGGREGATE BASE 1000 TON $13.00 $13,000.00 <br />8 BITUMINOUS BASE COURSE 200 TON $34.00 $6,800.00 <br />9 BITUMINOUS WEARING COURSE 1200 SY $4.00 $4,800.00 <br />10 12" CMP APPROACH CULVERTS 700 LF $25.00 $17,500.00 <br />11 CMP FLARED END SECTIONS 36 EA $150.00 $5,400.00 <br />12 SEED AND MULCH 7 ACRE $1,000.00 $7,000.00 <br />13 SILT FENCE 5000 LF $1.50 $7,500.00 <br />MOB. (5%) $18,015.50 <br />SOIL CORRECTION CONTINGENCY $37,800.00 <br />CONSTRUCTION COST $416,125.50 <br />SOFT COST (30%) $124,837.65 <br />TOTAL PROJECT COST $540,963.15 <br />