My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 04/10/2014
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2014
>
Agenda - Parks and Recreation Commission - 04/10/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:00:40 PM
Creation date
5/28/2014 1:55:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
04/10/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northwest Sewer Extension <br />City of Ramsey <br />TEMP. LIFT STATION AND FORCEMAIN <br />ITEM DESCRIPTION EST. QTY. UNIT UNIT COST TOTAL <br />1 LIFT STATION 1 LS $60,000.00 $60,000.00 <br />2 DRIVEWAY 1 LS $5,000.00 $5,000.00 <br />3 DEWATERING 1 LS $5,000.00 $5,000.00 <br />4 8" DIP FORCEMAIN 10000 LF $22.00 $220,000.00 <br />5 VACCUUM RELEASE MANHOLE 2 EA $3,000.00 $6,000.00 <br />6 FITTINGS 1540 LB. $1.50 $2,310.00 <br />7 CLASS 5 AGGREGATE BASE 1000 TON $13.00 $13,000.00 <br />8 BITUMINOUS BASE COURSE 200 TON $34.00 $6,800.00 <br />9 BITUMINOUS WEARING COURSE 1200 SY $4.00 $4,800.00 <br />10 12" CMP APPROACH CULVERTS 700 LF $25.00 $17,500.00 <br />11 CMP FLARED END SECTIONS 36 EA $150.00 $5,400.00 <br />12 SEED AND MULCH 7 ACRE $1,000.00 $7,000.00 <br />13 SILT FENCE 5000 LF $1.50 $7,500.00 <br />MOB. (5%) $18,015.50 <br />SOIL CORRECTION CONTINGENCY $37,800.00 <br />CONSTRUCTION COST $416,125.50 <br />SOFT COST (30%) $124,837.65 <br />TOTAL PROJECT COST $540,963.15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.