My WebLink
|
Help
|
About
|
Sign Out
Home
Comprehensive Plan Update
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1990-1999
>
1995 (Approved)
>
1994 Land Use Study
>
Comprehensive Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 11:57:33 AM
Creation date
8/18/2014 12:38:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
federal funds to acquire and improve additional park -and -ride sites. <br />Finally, it was recommended in the Plan that the City should evaluate travel patterns in the <br />Urban Service Area to determine the future need for public transportation services. It was <br />felt at the time that fixed route transit services might be extended to this area or a <br />paratransit services could be developed as a feeder system to an area where fixed route <br />services are provided, such as the City of Anoka. Transit stops are currently located at the <br />Anoka Metro Center and the Anoka Technical College. <br />Working Paper #1 <br />City of Ramsey Comprehensive Plan Update <br />Transportation Plan Element <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.