My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 12/01/2003
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2003
>
Agenda - Economic Development Authority - 12/01/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 1:41:12 PM
Creation date
1/12/2004 11:57:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
12/01/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(z) <br /> <br />(aa) <br /> <br />(bb) <br /> <br />(iii) surface water quality; <br /> <br />(iv) storm water controls, erosion controls and drainage; <br /> <br />(v) street and lot layout; <br /> <br />(vi) utilities; <br /> <br />(vii) landscaping; <br /> <br />(vi/i) basement elevations;,, <br /> <br />(ix) signage; <br /> <br />(x) easements for public utilities; <br /> <br />(xi) parking <br /> <br />(xii) building location and exterior building design and appearance. <br /> <br />Final Plat. "Final Plat" means the Master Final plat and the final plat the City <br />approves for each Phase in accordance with the RTC Controls. <br /> <br />Force Majeure. "Force Majeure" means acts of God, including, but not linked.to, <br />floods, ice storms, blizzards, tornadoes, landslides, lig12mmg and earthquakes (but <br />not including reasonably anticipated weather conditions for the geo~aph/c area); <br />nots, resurrections, war or civil disorder affecffmg the performance of work; <br />blockades; power or other utility fa/lures; fires or explosions; labor strikes or <br />labor shortages and shortage of materials. _Lf a party's performance of an <br />obligation under th_is Master Agreement is expressly made subject to Force <br />Majeure and the party is unable to perform the obligation within the time period <br />set forth in this Master Agreement as the result of an occurrence of a Force <br />Majeure, the time period in which the party is obligated to perform the obligation <br />is extended durmg the continuance of the Force Majeure and a reasonable per/od <br />for recovery or restoration thereafter. <br /> <br />Formal Notice. "Formal Notice" means notices g-iven by one party to the other if <br />in writing and if and when delivered or tendered either in person or by depositing <br />it in the Un/ted States mail for delivery via certified mail, return receipt requested, <br />with postage and postal charges prepaid, addressed as follows: <br /> <br />If to City: <br /> <br />City of Ramsey <br />i 5153 Now-then Blvd. <br />Ramsey, NEN 55303 <br />Attention: City Administrator <br /> <br />i555730vt3 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.