My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 10/09/2014
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2014
>
Agenda - Economic Development Authority - 10/09/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:29:10 PM
Creation date
10/9/2014 9:13:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
10/09/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
500 <br />450 <br />400 <br />350 <br />= 300 <br />ri <br />t 250 <br />200 <br />150 <br />100 <br />50 <br />0 <br />L <br />Armstrong <br />Anticipated 10-Year Crash Count <br />Ramsey SurIst Lake Thurston <br />Fairoak <br />Anticipated crashes <br />Previous dashes <br />250 <br />200 <br />50 <br />0 --_ <br />Jarvis <br />Intersection . Delay � <br />Alpine Armstrong Ramsey Sunfish Lake Thurston Fairoak <br />* AM Peak <br />■ PM Peak <br />— AM Previous <br />— PM Previous <br />Similar to Project Group 2, as bottlenecks at certain intersections are released, the next intersection down- <br />stream was expected to show increased delay and crashes. The same is true for Sunfish Lake Blvd. when the <br />signal at Thurston Ave. was removed. The graphs show delay and crashes slightly shifting to the west, while also <br />showed an overall decrease corridor -wide. <br />HIGHWAY 10 ACCESS PLANNING STUDY <br />65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.