Laserfiche WebLink
500 <br />450 <br />400 <br />350 <br />= 300 <br />ri <br />t 250 <br />200 <br />150 <br />100 <br />50 <br />0 <br />L <br />Armstrong <br />Anticipated 10-Year Crash Count <br />Ramsey SurIst Lake Thurston <br />Fairoak <br />Anticipated crashes <br />Previous dashes <br />250 <br />200 <br />50 <br />0 --_ <br />Jarvis <br />Intersection . Delay � <br />Alpine Armstrong Ramsey Sunfish Lake Thurston Fairoak <br />* AM Peak <br />■ PM Peak <br />— AM Previous <br />— PM Previous <br />Similar to Project Group 2, as bottlenecks at certain intersections are released, the next intersection down- <br />stream was expected to show increased delay and crashes. The same is true for Sunfish Lake Blvd. when the <br />signal at Thurston Ave. was removed. The graphs show delay and crashes slightly shifting to the west, while also <br />showed an overall decrease corridor -wide. <br />HIGHWAY 10 ACCESS PLANNING STUDY <br />65 <br />