Laserfiche WebLink
Open House #1 Summary <br />September 12, 2013 <br />Page 3 <br />• Would like to see more information on the Mississippi River Trail <br />extension on layout <br />• Owner of Ramsey Bikes likes the planned 3/ at Feldspar <br />• Remove the Dolomite access point on Hwy 10 <br />• Huge delays at Sunfish Blvd for local traffic due to signal and trains. Look <br />at retiming the signal here. <br />• Increase green time for SB left at Thurston <br />• Multiple comments placed near the apartment building south of Culvers: <br />Don't limit access, leave access open near Culvers on Hwy 10, increase <br />public transportation in the area. <br />4. Summary of Exhibit Material <br />a. Roll plot of Armstrong interchange layout <br />b. Roll plot of entire study area along Highway 10 <br />c. Video showing the existing conditions traffic simulation <br />d. PowerPoint displaying the concept toolbox which includes different design and <br />intersection alternatives that will be considered in this study <br />e. Exhibit boards showing background research and analysis (see following pages) <br />H:\MDOT\T42106500\1_Corres\C_public involvement\Open House 1\091213 OH 1 Summary.doc <br />DESIGNING FOR A BETTER TOMORROW <br />Bolton & Menk is an equal opportunity employer. <br />