My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 10/14/2003
Ramsey
>
Public
>
Minutes
>
Council
>
2003
>
Minutes - Council - 10/14/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 4:12:35 PM
Creation date
2/9/2004 8:39:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
10/14/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Motion carried, Voting Yes: Mayor Gamec, and Councilmembers Cook, Elvig, Kurak, Pearson, <br />Strommen, and Zimmerman. Voting No: None. <br />Motion by Councilmember Cook, seconded by Councilmember Elvig, to adopt Resolution #03- <br />10 -281 adopting Findings of Fact # 0655, presented by staff at the meeting, relating to a request <br />from Sauter and Sons to process demolition concrete on their site at 6151 141" Avenue NW. <br />Motion carried: Voting Yes: Mayor Gamec, and Councilmembers Cook, Elvig, Kurak, Pearson, <br />Strommen, and Zimmerman. Voting No: None. <br />Motion by Councilmember Cook, seconded by Councilmember Elvig, to adopt Resolution #03- <br />1 0 -281 A denying the request from Sauter and Sons to process demolition concrete on their site at <br />6151 141 Avenue NW. <br />Motion carried, Voting Yes: Mayor Gamec, and Councilmembers Cook, Elvig, Kurak, Pearson, <br />Strommen, and Zimmerman. Voting No: None. <br />Mayor Gamec recessed the regular meeting of the City Council at 9:05 p.m. <br />Mayor Gamec called the regular meeting of the City Council back to order at 9:15 p.m. <br />Case #9: Request for Review of Revised Site Plan of Ramsey Professional Building; <br />Case of Strongbuilt Townhomes, Inc. <br />Assistant Community Development Director Trudgeon stated that Strongbuilt Townhomes has <br />submitted revised building elevations and floor plans for the office building that was approved as <br />a part of the Mallard Ponds subdivision. City Code requires the Planning Commission and the <br />City Council review any revisions to the original site plan (such that as elevations) before <br />construction can begin. The Mallard Ponds subdivision was approved in October 2002 and <br />included a multi - tenant office building. Mallard Ponds was developed as a Planned Unit <br />Development, Under the development agreement, a multi - tenant office building is a permitted <br />use provided it meets B -1 or B -2 zoning district standards. The submitted plans contain several <br />changes from the approved site plan. The revised plans show a building height of 24.5 feet, as <br />opposed to 22.5 feet on the original plans (measured to the roof peak). City Code stipulates a <br />maximum building height of 35 feet in the B -1 and B -2 zoning districts. The approved site plan <br />indicated a faux ledgestone finish, while the revised plan indicates rock face with synthetic <br />stucco. There is also a reduction in the number of windows on the fagade and some changes in <br />some of the architectural detailing on the building. The revised site plan also shows skylights will <br />be added. An upper story has also been added to two of the four offices that will be in the <br />building. Other than building height, finish material, and architectural details, the site plan has <br />not changed substantially from the original plans. The Planning Commission and City staff <br />recommended approval of the amended site plan contingent upon compliance with City Staff <br />Review Letter dated September 24, 2003, revised October 10, 2003. <br />City Council /October 14, 2003 <br />Page 19 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.