Laserfiche WebLink
Preliminary Plat and Site Plan Reivew <br />Rivenwick 4th <br />March 5, 2004 <br />Page 8 of 8 <br /> <br />25. Mailbox Location. The placement of the mailboxes for the townhome development should be located within the <br /> private driveway collectors. <br /> <br />26. Other Permits. The applicant is responsible for any other permits required by other regulatory agencies. <br /> <br />The Planning Commission will be meeting at 7:00 p.m. on Thursday, March 1 I, 2004 at the Ramsey Fire <br />Station No. 2, 15050 Armstrong Blvd. NW, to review your preliminary plat and site plan. A copy of the case <br />cover sheet is enclosed. If you have any questions or need additional information, please don't hesitate to call <br />US. <br /> <br />Respectfully, <br /> <br />C~ITY OF RAMSEY ;3 <br /> <br />CC: <br /> <br />Chris Enger <br />Ryland Group <br />7600 Executive Drive <br />Eden Prairie, Nfl'/55344 <br /> <br />Cfvil Engineer P.E: <br /> <br />?aul Tumey <br />Pioneer Engineering <br />625 Highway 10 <br />Blaine, MN 55434 <br /> <br />70 <br /> <br /> <br />