Laserfiche WebLink
intersections beyond what is defined in the Exhibit "A" Layout will be the responsibility of the City. It <br />is agreed by the parties that all necessary right of way and easements will be in legal possession of the <br />County prior to award of bids for the project. Any City owned property or easements required for the <br />construction will be conveyed to the County at no cost. <br />DRAINAGE: <br />The City shall pay for a percentage of the cost of the storm sewer system, including the detention basins <br />and their outlet structures. The parties understand and agree that the maintenance of the completed storm <br />sewer system (excluding catch basins and catch basin leads), detention basins, and their outlet structures <br />shall be the sole responsibility of the City. <br />BITUMINOUS TRAIL: <br />The City shall pay for a portion of the cost of the bituminous trail as defined in the Exhibit "A". The <br />parties understand that the cost for the trail includes: bituminous surfacing, aggregate base, excavation <br />(including muck excavation), borrow material (granular and topsoil), and turf establishment. The parties <br />understand and agree that all future maintenance of the trails, including snow plowing, shall be the sole <br />responsibility of the City. <br />TRAFFIC CONTROL: <br />The parties agree and understand the cost share for traffic control shall be a prorated share based on the <br />project cost for traffic control divided by the total project cost. It is understood that Anoka County will <br />use best management practices to limit the amount of time that a segment of roadway is closed. <br />DRIVEWAYS: <br />The parties agree that all driveways affected (excluding those identified for removal) by the Project will <br />be reconstructed in kind. <br />LANDSCAPING/STREETSCAPING: <br />The parties agree that if the City wishes to include landscaping or streetscape features in the project, <br />they shall be designed in accordance with Anoka County Highway Department Landscape/Streetscape <br />Guidelines. The City's design of the landscaping/streetscape is to include the signed plan sheets, <br />specifications, estimated quantities and costs. The total cost of the design as well as the construction cost <br />above standard median cost will be at the expense of the City. At this time, the City is not requesting any <br />landscape or streetscaping upgrades. <br />UTILITIES: <br />The parties agree that the Exhibit "A" Layout does not include specific proposed utility locations. The <br />City will be responsible for the design of any sanitary sewer and water main improvements, which will <br />be incorporated into the project bid documents. The cost of the design and construction of these features <br />will be the responsibility of the City. The City's design of the sanitary sewer and water main utilities are <br />to include the signed plan sheets, specifications, estimated quantities and costs. <br />PERMITS: <br />