My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/09/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 04/09/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:22:42 AM
Creation date
5/14/2015 9:03:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
04/09/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Parkview East <br />Preliminary and Final Plat and Site Plan Review <br />April 3, 2015 <br />Page 3 of 4 <br />Plans for the front elevation (south) and rear elevation (north) for the apartment building have been provided. Plans <br />for each side elevation will also be required. The proposed materials consist of stone and brick at the base. The rear <br />elevation includes an enhanced stone entry with canopy and additional stone above. Other materials include <br />composite panel (i.e. fiber cement panels) and steel lap and vertical siding. Metal siding can be used as a <br />complementary material. In COR -1 sub -district buildings shall be primarily brick or comparable alternative and shall <br />comprise a minimum of fifty (50) percent of the non -glazed wall area. Calculations shall be provided for brick and <br />stone for each elevations. The City can approve deviations to the 50% brick or stone requirement provided that <br />another high-quality material is provided. <br />Colors have not been provided. Full colored elevation plans should be provided. The combination of composite and <br />steel in the differing patterns divides the floors and sections of the building. Multiple sections of the building are <br />articulated to break up the flat wall. In addition windows and decks are proposed for each unit that provide further <br />breaks in the building wall design. Additional information is required for the specific appearance of the individual air <br />conditioning units. Staff is concerned over the appearance, color, size and overall look of units on each elevation. <br />The south elevation includes garage doors for tuck under garages. Garage doors shall be in colors that are <br />complementary to the main building materials. The roof design is pitched with asphalt shingles. The elevation facing <br />Ramsey Parkway is actually the rear of the building and contains the same materials as the front. The first floor <br />contains windows to create street -level interest and pedestrian scale along this street frontage. <br />Five detached garage buildings are planned in the southern portion of the site. Three long buildings each containing <br />16 stalls are located in a row along the south property line with two additional buildings just north of this row <br />containing 22 stalls each. The garage buildings contain the same materials as the apartment building. The roofs are <br />pitched with additional accenting so that they are of a higher design standard than typical detached structures. The <br />materials will include stone, horizontal lap siding, shake siding and an asphalt shingle roof. The sides will contain the <br />stone and horizontal siding. The additional roof treatments and glass demonstrate a good effort in enhancing the <br />design of these detached structures. The use of stone at the base will help improve the longevity of these structures. <br />The Planning Commission, Economic Development Authority (EDA), Environmental Policy Board (EPB), and City <br />Council all expressed questions and potential concern regarding the use of detached garages as it relates to architectural <br />quality. Staff acknowledges that the Developer has enhanced the architecture of these detached garages, but seeks <br />policy direction regarding the status of this design. Staff would recommend considering removing all horizontal lap <br />siding on the back side of the southern garages and enhance the landscaping along said southern wall. The EPB did <br />recommend that landscape be added along this wall. <br />Trash enclosures are shown on the site plan in the parking lot and at the northeast corner of the building on the south <br />elevation. Details shall be provided as to the proposed material and design of the proposed enclosure. <br />Development Fees. The Developer will be required to pay development fees consistent with the City's approved <br />schedule of Rates and Charges. <br />Fee Amount <br /># of Units <br />Park Dedication <br />Trail Development <br />_Water Trunk <br />Sanitary Sewer Trunk <br />Stormwater Management <br />Street Light <br />Street Light 0 & M <br />$2,600/unit <br />$700/unit <br />$1,597/unit <br />$1,126 <br />121 <br />121 <br />$459 /unit <br />$1,300/light <br />$294/light <br />121 <br />121 <br />121 <br />l'BD <br />[BD <br />Total <br />$314,600 <br />$84,700 <br />$193,237 <br />$136,246 <br />$55,539 <br />TBD <br />TBD <br />
The URL can be used to link to this page
Your browser does not support the video tag.