Laserfiche WebLink
the road right-of-way and that the plantings be located at least 20 feet from <br />the road fight-of-way; it appears that these requirements are met. <br /> <br />10. <br /> <br />I2rltJllgg~ As a result of the proposed development, approximately one <br />additional acre will be rendered impervious. The grading plan calls for <br />directing the runoff to the right-of-way at two locations, one being a curb <br />cut spillway approximately 40 feet south of the building and the other at the <br />newly proposed north drive entrance. Once water is conveyed to the <br />shallow one foot ditch, it will follow to the north and pond in an existing <br />low area clef'meal by the 884 contour which covers an area of approximately <br />0.25 acres. An 18 inch culvert transmits the runoff to the east side of Basalt <br />Street where it would sheet into a natural area on the northwest portion of <br />the private lot before eventually discharging to the wetland north of County <br />Road #116. It is suggested that a sump mca be constructed on Lot 4 with a <br />bottom elevation of 862 feet over an area of 3,500 square feet. This would <br />be sufficient to contain a two inch runoff event. The additional runoff from <br />greater precipitation events would be handled with overflow into the <br />naturally, existing low area and percolation into the predominantly sandy <br />soils. <br /> <br />11. <br /> <br />Building Materials: The proposed structure will be a cement block <br />consa'uction with a metal roof. This does meet City Code requirements for <br />an exterior facing finish of 50% other than metal. Some integration of color <br />and/or texture into the block would be desireable. <br /> <br />12. <br /> <br />Lighting: Plans for exterior lighting were not shown on the site plan. Any <br />on-site lighting should be arranged so as not to emit an excessive mount of <br />lighting off the property. <br /> <br />The Planning and Zoning Commission will be meeting at 7:30 p.m. on Tuesday, <br />June 1, 1993, to consider your request for a conditional use permit and site plan <br />approval Enclosed for your information is a copy of the proposed findings of fact <br />and conditional use permit relating to your request for a conditional use permit. I <br />suggest that you, or your representative, be present at the meeting to answer any <br />questions that may arise. <br /> <br />tf you have any questions, please don't hesitate to call. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Sylvia Frotik <br />Zoning Administrator <br /> <br />Steven Jank~ <br />City Engineer <br /> <br />Enclosures <br /> <br /> <br />