Laserfiche WebLink
A Anoka Conservation District <br />A � 1( 1318 McKay Drive NE, Suite 300 <br />CON$ERVATIONQrTHam Lake, Minnesota 55304 <br />1111 RIC I Ph: 763-434-2030 Fx: 763-434-2094 <br />www.AnokaSWCD.org <br />CITY OF ANOKA $TORMWATER RETROFIT ANALYSIS <br />Target Waterbody: Rum River <br />The purpose of this project is to improve stormwater quality and reduce the volume of runoff <br />from areas within the City of Anoka which contribute to the degradation of the Rum River. The <br />goal is to identify and prioritize projects that provide the greatest amount of stormwater <br />treatment per dollar spent, allowing the implementation of projects in a systematic way that <br />maximizes the use of limited financial resources. <br />TALK$ <br />STORMWATER RETROFIT ANALYSIS PROCESS* <br />STEP AND PURPOSE <br />KEY TASKS <br />• <br />Overview of process <br />TAC Meeting 1 <br />• <br />Define core retrofitting objectives <br />Kickoff and scoping <br />• <br />Identify preferred retrofit treatment options <br />• <br />Establish focus area <br />• <br />Delineate subwatershed focus area <br />Desktop Analysis <br />• <br />Secure GIS and other mapping <br />Search for potential retrofit sites <br />throughout the subwatershed <br />• <br />Conduct desktop search for potential retrofit sites <br />• <br />Prepare base maps for reconnaissance <br />TAC Meeting 2 <br />• <br />Present drainage area delineations and potential retrofits <br />Desktop review <br />identified as part of the desktop analysis <br />• <br />Verify drainage areas and mapping data <br />Subwatershed Reconnaissance <br />Investigate retrofit sites in the field <br />• <br />Assess site constraints <br />• <br />Search for additional retrofit opportunities <br />• <br />Develop project concepts <br />Treatment Analysis/Cost Estimates <br />Create project concepts and model for <br />• <br />Utilize a water quality computer model for determining <br />treatment potential <br />pollution and volume reduction (WinSLAMM) <br />• <br />Develop project cost estimates <br />Evaluation and Ranking <br />• <br />Conduct cost/removal analysis for project concepts <br />Compare projects throughout the <br />• <br />Rank projects by cost-effectiveness <br />subwatershed <br />• <br />Compare results to restoration objectives <br />TAC Meeting 3 <br />Review of Complete Draft <br />• <br />Review of the draft report <br />Presentation <br />• <br />Presentation of final report <br />*Process modified from The Center for Watershed Protection's Urban Stormwater Retrofit <br />Practices Manuals (2005 and 2007) <br />