Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />'1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />10) _S~h_oj~_lder All Blackto[ Roads: <br /> <br />hasn't been started but is still in the plans for this fall. <br /> <br />11) _C~l_e_an Ditches in Ramsey Terrace: <br /> <br />~nis was a low priority project and did not get done. It will be extended <br />to next spring. <br /> <br />12) Clean Ditch and Build Berm on 156th Avenue East of Ramsev Blvd.: <br /> <br /> This ditch can't be cleaned because of telephone cables but the berm will <br /> be built with CL-5 and should eliminate the problem. <br /> <br />13) Pj]t_._Up Barricades on Ends of Streets: <br /> <br /> Some barricades have been installed and we will install more as we see the <br /> need for them. <br /> <br />14) Clean Ditch and Waterway at 16021 Osium Street: <br /> ~lis project has been completed. <br /> <br />Other projects throughout the year that were not listed above: <br /> <br />We bad two cement culverts that separated and the roads caved in. ~ney <br />had to be dug. out and reset. We had to build an outslope on Ebony Street <br />and sod it to keep a field from washing out. We hauled the rocks away <br />from City Hall and helped cement that area. We also built some shelves <br />for City Hall and our shop and we built a sign rack so we can see what <br />signs we have at a glance. We built two trailers for street and park use <br />and put an exhaust system in the shop. We also piped an air line around <br />the inside of the shop. We built and installed push bumpers on all the <br />squad cars. We cleaned some culverts and reset others where we had.flooding <br />problems. There are many more culverts to be cleaned throughout the City. <br />These projects, along with the normal daily maintenance have kept the Street <br />Department extremely busy this summer. <br /> <br />MM:po <br /> <br /> <br />