My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/16/2016
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2016
>
Agenda - Public Works Committee - 02/16/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:47:56 AM
Creation date
4/4/2016 4:03:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. EXISTING CONDITIONS <br />3.1 Storm Sewer / Drainage Systems <br />The existing storm sewer system serving Business Park 95 includes a system of catch basins, <br />manholes and concrete storm sewer pipes located within the existing network of streets. Three <br />stormwater ponds also serve the development by retaining stormwater runoff thereby preventing <br />downstream flooding, and by removing pollutants from the stormwater runoff. <br />Figure 1 in Appendix A shows the existing storm sewer network, as well as all properties that <br />will benefit from the proposed improvements. <br />3.2 Watermain <br />Business Park 95 is fully served by City watermain located within street right-of-ways. <br />3.3 Sanitary Sewer <br />Business Park 95 is fully served by City sanitary sewer located within street right-of-ways. <br />3.4 Streets <br />Business Park 95 is served by the following street segments; <br />• Sunfish Lake Boulevard — Highway 10 to Bunker Lake Boulevard <br />• Bunker Lake Boulevard — Sunfish Lake Boulevard to Unity Street <br />• McKinley Street — Sunfish Lake Boulevard to Radium Street <br />• Sunfish Lake Court — East of Sunfish Laker Boulevard <br />• Unity Street — McKinley Street to Bunker Lake Boulevard <br />• Radium Street — McKinley Street to 140th Avenue <br />• 140th Avenue — Unity Street to Radium Street <br />3.5 Land Use <br />The proposed stormwater pond outlet improvements will provide improved stormwater treatment <br />to sixteen properties located within the Business Park 95 development, all of which are zoned for <br />industrial use. <br />Feasibility Report <br />Business Park 95 Regional Stonnwater Pond Outlet Improvements <br />City of Ramsey Project No. 16-36 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.