My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/16/2016
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2016
>
Agenda - Public Works Committee - 02/16/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:47:56 AM
Creation date
4/4/2016 4:03:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. FINANCING <br />5.1 Opinion of Cost <br />A detailed opinion of probable costs for the proposed improvements can be found in Appendix B <br />of this report. The opinion of probable costs incorporates anticipated 2016 construction costs for <br />the proposed improvements, as well as 10% construction contingencies plus 23% indirect costs <br />for administrative, engineering, financing and legal costs. <br />City staff prepared the Feasibility Report in-house as part of staff's normal duties. <br />A Geotechnical Evaluation Report was not completed as part of this project. <br />5.2 Funding <br />5.2.1 Stormwater Utility Funds <br />The pond outlet improvements are proposed to be funded entirely with Stormwater <br />Utility Funds. While Staff explored the use of special assessments to benefiting <br />properties to pay for a portion of the costs, project records indicate that the City fully <br />intended to construct the outlet improvements when warranted without assessing <br />benefiting properties within the business park. Staff therefore proposes to utilize <br />Stormwater Utility Funds to pay for all of the improvements. <br />5.2.2 Special Assessments <br />The City's adopted Special Assessments Policy allows for the use of special assessments <br />to pay for a portion of storm sewer improvement projects. However, available project <br />records indicate that the City fully intended to construct the outlet improvements when <br />warranted without assessing benefiting properties within the business park so Staff is <br />proposing to utilize Stormwater Utility Funds to pay for all of the improvements. <br />Feasibility Report <br />Business Park 95 Regional Stonnwater Pond Outlet Improvements <br />City of Ramsey Project No. 16-36 <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.