My WebLink
|
Help
|
About
|
Sign Out
Home
06/09/89
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Minutes
>
1989
>
06/09/89
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 1:22:22 PM
Creation date
5/24/2004 12:29:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Airport Commission - Metropolitan Council
Document Date
06/09/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Given needed enhancements, could your operations now being performed <br /> accommodated at a reliever airport in the Metropolitan Area.'? (please circle) <br /> <br /> a. yes b. no <br /> <br />6. If yes, what reliever airport would you most likely use? <br /> <br /> a. Anoka b. Downtown St. Paul c. South St. Paul d. Crystal <br /> L Lake Elmo g. Airlake h. Other <br /> <br />7. What improvements are needed at your chosen reliever Airport? <br /> <br />Runway length <br />Air Traffic Control Tower <br />Instrument Landing System <br />Transient Hangars <br />FBO Service/Security <br />Repairs/Avionics <br />Ground Transportation <br />Snow Removal <br />Fuel .type and price <br />Pilot/~assenger amenities <br /> <br />Very Important <br /> <br />De~ree of Im_~ortance <br /> Some consideration <br /> <br />e. Flying Cloud <br /> <br />Not Important <br /> <br />3 2 1 <br />3 2 1 <br />3 2 1 <br />3 2 1 <br />2 1 <br />3 2 <br />3 2 1 <br />3 2 1 <br />3 2 1 <br />3 2 1 <br /> <br />at MSP be <br /> <br />10. <br /> <br />If you require additional usable runway length to use your selected reliever airport, what runway <br />is needed to accommodate your aircraft at its required stage length and load factors? (please <br />circle) <br /> <br />a. 4,000- 5,000 feet <br />b. 5,000- 6,000 feet <br />c. 6,000 - 7,000 feet <br />d. 7,000- 8,000 feet <br /> <br />Is the Metropolitan area in need of an additional reliever to supplement <br />geographic coverage, ff so within which quadrant is this additional reliever needed'?. <br /> <br />the system's <br /> <br />a. Coverage is adequate <br />b. Additional reliever needed to the north of the Twin Cities <br />c. Additional reliever needed to the south of the Twin Cities <br />d. Additional reliever needed to the east of the Twin Cities <br />e. Additional reliever needed to the west of the Twin Cities <br /> <br />If a new major air carder airport were developed to serve the TMn Cities, how might this <br />impact your trips to the Twin Cities7 <br /> <br />a. Would use a new major airport to the "south" or "north" <br />b. Would continue to use MSP, if possible <br />c. Would use a reliever airport (see map insert, specify letter.__) <br /> <br />Thank you for your cooperation <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.