My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/08/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/08/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:06 PM
Creation date
6/4/2004 2:54:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/08/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Brian Olson <br />City of Ramscy <br />Proposal for Engineering Services - CSAH 83 (Armstrong Boulevard) Reconstruction <br />June 3, 2004 <br />Page 3 <br /> <br />P. 0~ <br /> <br />C. PRELIMINARY <br /> <br />2. <br /> <br />3. <br /> <br />4_ <br /> <br />5. <br /> <br />6. <br /> <br />7. <br /> <br />GEOMETRIC LAYOUT <br /> <br />R~:view turn lanes included in the OWNER'S preliminary geometric layout. <br /> <br />Re,Mew layouts of horizontal/vertical location of BNSF crossing. <br /> <br />Revise the prelimii~.ary geometric layout. <br /> <br />D{',sign east and we~t legs ofCR 116. <br /> <br />Design pI'ofiles for east and west legs of CR 116. <br /> <br />D~:terminelincorpo~ ate the preliminary construction limits, <br /> <br />Prepare Opinion of Probable Construction Cost for the preliminary geometric <br />la:/out. <br /> <br />St',bmit geometric hyout for the OWNER'S review and approval. <br /> <br />Rt~vise geomeu'ic latyout per the OWNER'S comments. <br /> <br />TRAF.FIC CONTROl, SIGNAL SYSTEM <br /> <br />1. Cc~ordinate receivi~g t~ affic counts from Anoka County, <br /> <br />2. Plepare three Signal Justification Reports. <br /> <br />3. Prepare and submit three preliminary Traffic Signal Plans. <br /> <br />4. P~epare and submit three final Traffic Signal Plans. <br /> <br />5. Revise and resubmit tka'ee final Traffic Signal Plans. <br /> <br />6. P~mpare Opinion of Problem Construction Cost for the three Traffic Signal Plans. <br /> <br />7. C,mplete and submit three sets of Division SS Special Provisions. <br /> <br />DETAIL DESIGN PLANS AND SPECIFICATIONS <br /> <br />1. 30% Plan Su-bmitta~ <br /> <br /> Prepare Storm Sewer design, <br /> <br /> b, Develop Alignr~ent PlanFFabulation. <br /> c. Develop Typica, I Sections and Insets. <br /> d Develop Gener:d Layout Plan. <br /> <br /> Develop Roadvay Construction Plans. <br /> <br /> f. Develop tnplac¢:/RemovalsPlan. <br /> <br /> Develop Road,any Profiles_ <br /> <br /> h. DevelopTabul~fion Sheets. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.