My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/08/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/08/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:06 PM
Creation date
6/4/2004 2:54:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/08/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN-05-~00~ 00~5~ TKDA G~l ~ 00~ P.05 <br /> <br />Mr. Brian Olson <br />City of Ramsey <br />Proposal fro: Engineering Services - CSAH 83 (Armstrong Boulevard) Reconstruction <br />June 3, 2004 <br />Page 4 <br /> <br />i. Develop Cross Sections. <br />j. Develop Title Sheet. <br /> <br />k. Develop Statement of Estimated Quantities (SEQ) Sheets. <br /> Quality Control Review of Plan documents, <br /> Prepare 30% O~finion of Probable Cost. <br /> <br />n. Plot anti submit 30% Review Package, <br />95% Plan Submitta <br />a. Prepare Drainat,.e Plans, Profiles, Tabulations. <br />b. Prepare Tempo.~ a~y Erosion Control/Tuff Plans. <br />c. Prepare Permanent Erosion Control/Tuff Plans. <br />d. Incorporate 30% Review Comments_ <br /> <br />e. Finalize the Tyl,ica! Sections and Insets. <br /> Finalize Gencra i Layout Plan. <br /> Finalize Roadway Construction Plans. <br /> h. Finalize InplaceW, emovals Plan. <br /> i. Finalize Roadw4y Profiles. <br /> j, Finalize Tabula.,'~o~s. <br /> k, Finalize Details <br /> 1. Finalize Cross <br /> m. Finalize Title Slteet <br /> n, Finalize SEQ. <br /> o. Finalize Constr~,ction and Soils Notes. <br /> p. Incorporate Stattdard Plan Sheets. <br /> q. Develop Pavem~:nt Marking Plans. <br /> r, Develop Signinj( Plans, <br /> s. Quality Control Review of Plan documents. <br /> t. Prepare 95% Opinion of Probable Cost. <br /> u. Plot and submit 95% Review Package. <br /> Final Plan Submitta.' <br /> a. Incorporate 95~ PLm Comments. <br /> b. Develop Special Pr(,visions. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.