My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/08/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/08/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:06 PM
Creation date
6/4/2004 2:54:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/08/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmcmber Zimmerman asked about thc input the Committee requested from the Finance <br />Officer. <br /> <br />Assistant Public Works Director O1 ~on replied the Finance Officer indicated 1.55 million dollars <br />is available ['or thi,~: project il' the Council were to determine to use all the remaining balance of <br />the Oak lhu'I¢ [:trod. Thc total cstin~atcd cost is 1.21 lnillion dollars. The estimates put forward <br />i:ISS[II-IIC [he \V()l',%t, cilsc SCelmrios. <br /> <br />Councilmcmbcl' (i(~ok stated he do:s l~ot mind two different bids, but it should be left open to <br />complete thc project in one buildinu season. <br /> <br />Cotmcilmcmbcr t~]vig noted only ~,2 inches of topsoil are needed, not the 36 inches that was <br />originally estimated, but tho cost oF the 36 inches is still included in the estimate. The actual <br />costs will likely bc lower than the estimate. He asked if the specifications regarding the topsoil <br />would be outlined clearly. <br /> <br />Assistant Public ¥¥orks Director Osrm replied the City has the ability to change things as they <br />sec lit with thc soil conditions. <br /> <br />Motion by Councilnmmber Kut'ak, ';ec~mded by Councilmember Cook, to authorize solicitation <br />el'bids For l:';lrncrcst Park lmprovem..vnts City Project #04-20. The base bid will include the items <br />identified in the moderate prot)osal, with the remainder of the work bid as an alternate. <br /> <br />Motion carried. \,oting Yes: Ma:/or Gamec, Councihnembers Kurak, Cook, Elvig, Pearson, <br />Stromlnel-t, arid Zi~mncnnan. Votin;5 No: None. <br /> <br />The mccting was recessed at 8:32 p. m, and reopened at 8:42 p.m. <br /> <br />Case #4: <br /> <br />Request fin' Sketcl~ P~an Review for a Commercial/Retail Portion of the <br />Ramsey Town Cent,.~r; Case of Ramsey Town Center, LLC <br /> <br />Assistant C. omnmrtity Developmeni Diccctor Trudgeon explained this is the sketch plan review <br />of thc third phase of Ramscy Town Center, After meeting with the Town Center Review Board <br />substantial l)ositivc' changes have i~een made to the plan. At the last Planning Commission <br />meeting the Commission ai~proved the plan subject to the conditions in the staff review letter. <br />Thc Town C?e~mzr 'Iask Force also al)proved of this plan. <br /> <br />Kcith McDonald, ['rcsictcnt of Sl:ingobee Builders, stated they have had a great working <br />relationship wilh thc City and are hc~-e to answer any questions of the Council. <br /> <br />Councihucml)c~' Kumk questioned i.'a liner is proposed for the pond. <br /> <br />Mr. McDonal{[ rcpiicd more ihan Iii.ely a liner will be needed. In the beginning a very big pond <br />was planned, they tmve worked witl, the Engineering Department to find an engineering solution <br /> <br />City Council/May 11, 2004 <br />Page 18 of 36 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.