Laserfiche WebLink
31. That the proposed site grading and drainage plan adequately addresses <br />concerns of the Department of Natural Resources regarding storm drainage <br />with adequate capacity for a 100 year rainfall runoff. <br /> <br />32. That the Ramsey Airport Commission is opposed to the proposed aggregate <br />extraction and asphalt operations for the following reasons: <br /> <br />a. The proposed uses conflict with the current Comprehensive Plan; <br />b. The proposed uses are adjacent to a residential neighborhood; <br />c. The proposed umes would create excessive noise, traffic, smoke, <br /> fumes and odors; <br />d. The proposed uses would impact Gateway North Airport; and <br />e. The City is currently in the process of enacting an airport <br /> zoning ordinance which pertains to all of the above. <br /> <br />33. The proposed height of the silos for the asphalt operation exceed the <br />maximum height permitted in Sections 170.016I and 170.0112B of the City <br />Code. <br /> <br />34. That the proposed asphalt operation will be regulated by the Minnesota <br />Pollution Control Agency and the Environmental Protection Agency. <br /> <br />35. <br /> <br />36. <br /> <br />37. <br /> <br />38, <br /> <br />-3 - <br /> <br /> <br />