My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/28/1984
Ramsey
>
Public
>
Agendas
>
Council
>
1984
>
Agenda - Council - 08/28/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:18:31 AM
Creation date
7/13/2004 1:57:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/28/1984
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m <br /> <br />I mere than ninety (~) ~ys prior to closure, the second at least thirty <br /> (30) mhd not mere than sixty (60) (lays prior to closure, and the final <br /> <br />m notice upon completion of landftlltng activity. <br /> The landfill operator will post a sign at the site's gate and in <br /> the gate attendant's window sixty (60) days prior to and until i20 days <br /> <br />after completion of landftll ing activity notifying landfill customers <br /> <br /> of the closure date and locations of alternative disposal facilities. <br />m <br />m Securit~ <br /> <br />m After closure, only those persons authorized by the landfill <br /> operator and/or ownen will be permitted on the site to perform closure <br />m and post-closure duties outlined in this report. Existing fencing will <br /> <br />m be ~intained around the perinmter of the site. The on-site access <br /> point will renmin locked to restrict further use and unauthorized <br /> <br />m access to the site. <br /> Ultimate fencing requirenents will be ~dified based on the final <br />m end use of the site as determined by the o~mer. <br /> <br />I <br />m <br />! <br /> <br /> 3. Responsible Party <br /> <br /> At the time of closure, the landfill operator will provide the <br />MPCA and the Deparbnent with the name, address, and telephone number of <br />the person responsible for the facility during the post-closure period. <br /> <br /> 4. Final Cover <br /> <br />m <br />m <br /> <br /> During the closure period, areas not yet completed will be brought <br />to final grade and at least 2t feet of material will be placed, graded <br />and compacted. Final cover placenent and grading shall conmence no <br /> <br />I <br />m <br />m <br /> <br />later than 30 days prior to, and be completed no later than thirty (30} <br />days following, cessation of landfilling activity [consisting of 6 <br />inches of daily cover, 1 foot of lime sludge, 1 foot of on-site cover <br />soils, and 6 inches of top soil. There are 3 main top soil stockpiles <br /> <br /> 3 <br /> <br />m <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.