My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/25/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 10/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:53:58 PM
Creation date
11/23/2016 1:34:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7.7. <br /> Meeting Date: 10/25/2016 <br /> By: Tim Gladhill,Community Development <br /> Information <br /> Title: <br /> Consider Work Order for Sunwood Drive Roundabout Strectscape Design <br /> Purpose/Background: <br /> At the September 27,2016 Work Session, the City Council requested a discussion on Strectscape design for the <br /> Sunwood Drive Roundabout in The COR. This discussion occurred as part of Council Input. Consensus of the City <br /> Council was to pull this improvement project from the broader'Corridor Improvement'initiative of the Strategic <br /> Plan,which aims to improve the viewshed of key corridors and nodes. <br /> The discussion from the September 27 Work Session is below: <br /> [Kuzma]stated that there was past discussion with doing something at the roundabout and noted that he would like <br /> to bring back that item for discussion. <br /> City Administrator Ulrich noted that item was lumped into the corridor discussions but stated that if that is a high <br /> priority item, it could be pulled out for separate discussion. He confirmed that staff could bring that forward for <br /> future discussion. He complimented the public works crews that did a great job mowing around The COR areas this <br /> summer. <br /> Timeframe: <br /> 30 minutes <br /> Observations/Alternatives: <br /> In order to frame the discussion, Staff has obtained a quote from WSB for Streetscape Design Services to prepare <br /> Concept Layout and Engineer's Estimates. The total amount for the services would be a not to exceed$11,989.00. <br /> This would allow the City Council to evaluate alternatives and clarify the scope and acceptable costs to achieve the <br /> desired outcome. <br /> This step would not take the City all the way to construction. Future steps would include final design and bid <br /> documents. Optional future steps could also include bid management, construction administration, and field <br /> inspections. Staff will provide a more detailed estimate of these future costs at the meeting. Staff is working with <br /> WSB to finalize these numbers. <br /> There are additional optional services to consider with this first step. A 3D model and animated fly-through could <br /> be added at an amount of$7,500. Additional renderings come at a cost of$2,500 per rendering. At this time, Staff <br /> is not recommending these additional services. Staff will re-evaluate at key points in the process and review with <br /> the City Council at that time. <br /> Alternative 91 -Recommend that the City Council approve the Work Order for Strectscape Design. <br /> Alternative 92 -Recommend that the City Council authorize a Request for Proposals(RFP). Given that the scope of <br /> services is less than$40,000,the City's Finance Policy does not require this step. These services fit in nicely with <br /> WSB's assistance with land use planning for The COR. <br /> Alternative 93 -Recommend that the City Council authorize design services,but complete in house. This step <br />
The URL can be used to link to this page
Your browser does not support the video tag.